Nike Clearwire Wireless Communication Facilities
CX(s) Applied: B1.7, B1.15, B1.19
Date: 01/27/2010
Location(s): Washington County, Oregon
Office(s): Bonneville Power Administration
The proposed project includes construction and operation of Communication (Clearwire) wireless facilities on the Keeler-Oregon City #2 transmission line, at tower 9/2 in Washington County, Oregon. Clearwire is interested in locating three panel antennas and three microwave dishes atop the 79 foot tower. Coaxial cables will run to a support cabinet mounted on an at-grade 7 feet by 7 feet concrete slab within and existing T-Mobile fenced area. All construction activities will occur within a previously disturbed, fenced-in area within the existing Bonneville Power Administration right-of-way.