You are here

CX-000482: Categorical Exclusion Determination

Project Number MS-09-116 - Structural Assessment of Big Hill Raw Water Intake Structure, Big Hill Brine Disposal Pump Pad and Bryan Mound Raw Water Intake Structure
CX(s) Applied: B1.3
Date: 12/29/2009
Location(s): Texas
Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office

Perform a structural assessment of concrete structures at the Big Hill Raw Water Intake Structure, The Big Hill Brine Disposal Pump Pad and the Bryan Mound Raw Water Intake Structure.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD