CX-000205: Categorical Exclusion Determination

MDSP Design DevelopmentCX(s) Applied: A9, B3.1Date: 11/23/2009Location(s): South DakotaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

Office of NEPA Policy and Compliance

November 23, 2009
Estimated Read Time   min
MDSP Design Development
CX(s) Applied: A9, B3.1
Date: 11/23/2009
Location(s): South Dakota
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

Approximately 30 miles of natural gas pipeline would need to be constructed. The pipe would run from Yankton, South Dakota, to Springfield, South Dakota.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD