Categorical Exclusion Determinations: Washington

Location

Categorical Exclusion Determinations issued for actions in Washington.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • May 3, 2013

    Interstate Electrification Improvement
    CX(s) Applied: B5.1
    Date: 05/03/2013
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • April 30, 2013

    Franklin-Badger Canyon #2 & Walla Walla-Pendleton #1 Wood Poles
    CX(s) Applied: B1.3
    Date: 04/30/2013
    Location(s): Washington, Oregon
    Offices(s): Bonneville Power Administration

  • April 18, 2013

    Merritt Radio Station Upgrade
    CX(s) Applied: B1.19
    Date: 04/18/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 15, 2013

    Synthetic Microorganisms to Enable Lignin to Fuel Conversion
    CX(s) Applied: A9, B3.6
    Date: 04/15/2013
    Location(s): Texas, Georgia, Washington
    Offices(s): Golden Field Office

  • April 15, 2013

    Pacific Northwest National Laboratory- Novel Membrane Dehumidifier-enabled Air Cooling
    CX(s) Applied: B3.6
    Date: 04/15/2013
    Location(s): Washington, Ohio, Texas
    Offices(s): Advanced Research Projects Agency-Energy

  • April 11, 2013

    Pacific Northwest National Laboratory- Genset Heat Recovery Adsorption Chiller for Navy Forward Operations Bases
    CX(s) Applied: B3.6
    Date: 04/11/2013
    Location(s): Washington, Oregon, Georgia
    Offices(s): Advanced Research Projects Agency-Energy

  • April 9, 2013

    Chinook Property Funding - Update
    CX(s) Applied: B1.25
    Date: 04/09/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 5, 2013

    Digital Communication System Upgrade Project: ‘D’ Analog System Retirement and #WC SONET Ring
    CX(s) Applied: B1.19
    Date: 04/05/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 3, 2013

    Augspurger Radio Tower Replacement Project
    CX(s) Applied: B1.19
    Date: 04/03/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • April 3, 2013

    Activity-Specific Categorical Exclusion for Deep Borehole Drilling, Sampling, and Characterization for the Proposed Natural Gas Pipeline from Pasco, Washington to the Hanford Site 200 East Area
    CX(s) Applied: B3.1
    Date: 04/03/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • April 1, 2013

    Chinook Property Funding
    CX(s) Applied: B1.25
    Date: 04/01/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • March 27, 2013

    Fairmount Substation Equipment Acquisition
    CX(s) Applied: B1.24
    Date: 03/27/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • March 25, 2013

    Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line
    CX(s) Applied: B1.3
    Date: 03/25/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • March 25, 2013

    Revenue Meter Replacement at Franklin County Public Utility District’s (PUD) Taylor Flats Substation
    CX(s) Applied: B1.7
    Date: 03/25/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • March 22, 2013

    Wenatchee District Wood Pole Replacements
    CX(s) Applied: B1.3
    Date: 03/22/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • March 21, 2013

    Install High Frequency Antennas at Bonneville Power Administration Maintenance Headquarters
    CX(s) Applied: B1.19
    Date: 03/21/2013
    Location(s): Oregon, Washington, Washington
    Offices(s): Bonneville Power Administration

  • March 14, 2013

    Home Energy Score Partner Implementation Model
    CX(s) Applied: A9
    Date: 03/14/2013
    Location(s): Washington
    Offices(s): Golden Field Office

  • March 13, 2013

    Revenue Meter Replacement at Benton County Public Utility District’s (PUD) Finley Substation
    CX(s) Applied: B1.7
    Date: 03/13/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • March 11, 2013

    2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects
    CX(s) Applied: B1.3
    Date: 03/11/2013
    Location(s): Oregon, Oregon, Washington, Montana, Montana
    Offices(s): Bonneville Power Administration

  • February 6, 2013

    Coulee-Westside Transfer Trip Replacement
    CX(s) Applied: B1.7
    Date: 02/06/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • January 22, 2013

    MSA Annual Categorical Exclusion for Facilities for Storing Packaged Hazardous Waste for 90 Days or Less
    CX(s) Applied: B6.4
    Date: 01/22/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • January 16, 2013

    Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat in Useful Electric Power
    CX(s) Applied: B3.6
    Date: 01/16/2013
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • January 15, 2013

    Innovations in Advanced Materials and Metals (IAM2)
    CX(s) Applied: A9, A11
    Date: 01/15/2013
    Location(s): Washington
    Offices(s): Golden Field Office

  • January 15, 2013

    Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries
    CX(s) Applied: A9, B3.6
    Date: 01/15/2013
    Location(s): Iowa, Oklahoma, Washington
    Offices(s): Golden Field Office

  • January 7, 2013

    Roosevelt Radio Station Emergency Generator Removal and Replacement
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration