Categorical Exclusion Determinations: Washington

Location

Categorical Exclusion Determinations issued for actions in Washington.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • November 26, 2013

    Ninemile Creek Lower Property Funding
    CX(s) Applied: B1.25
    Date: 11/26/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 26, 2013

    Wanacut Creek Upper Property Funding
    CX(s) Applied: B1.25
    Date: 11/26/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 25, 2013

    Aeneans Creek Spring Property Funding
    CX(s) Applied: B1.25
    Date: 11/25/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 22, 2013

    Covington District Culvert Replacements
    CX(s) Applied: B1.3
    Date: 07/22/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 21, 2013

    Managing Zirconium Chemistry and Phase Compatibility in Combined Process Separations for Minor Actinide Partitioning
    CX(s) Applied: B3.6
    Date: 11/21/2013
    Location(s): Washington
    Offices(s): Idaho Operations Office

  • November 19, 2013

    Grand Coulee-Bell No.5 Dead End Insulator Replacement Project
    CX(s) Applied: B1.3
    Date: 07/19/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • November 12, 2013

    Insulator Replacement on North Bonneville-Midway No. 1 Transmission Line (update to previous CX issued 7/16/13)
    CX(s) Applied: B4.6
    Date: 11/12/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 8, 2013

    Grays River Confluence Property Funding
    CX(s) Applied: B1.25
    Date: 11/08/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 8, 2013

    Spectroscopy System for Teaching and Research
    CX(s) Applied: B1.31
    Date: 11/08/2013
    Location(s): Washington
    Offices(s): Idaho Operations Office

  • November 6, 2013

    Upgrade Six Wireless Communication Sites (Clear Creek, Evergreen, Fruit Valley, KSLM, Minnehaha, Popcorn)
    CX(s) Applied: B1.19
    Date: 11/06/2013
    Location(s): Oregon, Washington, Washington
    Offices(s): Bonneville Power Administration

  • November 5, 2013

    CH2MHill Plateau Remediation Company - Small-scale Research and Development, Laboratory Operations, and Pilot Projects, November 2013 to November 2014
    CX(s) Applied: B3.6
    Date: 11/05/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • November 1, 2013

    "Equipment Additions to the Ostrander and Pearl Substations and Dittmer Control Center

    CX(s) Applied: B1.7
    Date: 11/01/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration"

  • October 28, 2013

    Siting, Construction, and Operation of New Septic Tank, Drain Field and Fencing at the 400 Area Fast Flux Test Facility
    CX(s) Applied: B1.15
    Date: 10/28/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 15, 2013

    Usk-Boundary No. 1 Transmission Line Impairment Remediation
    CX(s) Applied: B1.3
    Date: 10/15/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • October 10, 2013

    Balancing Authority Area Services Agreement with Port Townsend Paper Corporation
    CX(s) Applied: B4.1
    Date: 10/10/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration

  • October 3, 2013

    Site Characterization and Environmental Monitoring for the Evaluation of Beryllium to Other Naturally Occurring Metals On and Near the Hanford Site
    CX(s) Applied: B3.1
    Date: 10/03/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 2, 2013

    Security Upgrades at Multiple Substations
    CX(s) Applied: ?
    Date: 10/02/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration

  • September 30, 2013

    Echo Lake Substation Isolation Disconnect Switch Installation
    CX(s) Applied: B4.6
    Date: 09/30/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 26, 2013

    Driscoll-Naselle #1 Tower Relocation
    CX(s) Applied: B1.3
    Date: 09/26/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 25, 2013

    Hardeson Small Generator Integration
    CX(s) Applied: B1.7
    Date: 09/25/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 24, 2013

    Longview and Tillamook Substation Communication Upgrades
    CX(s) Applied: B1.7
    Date: 09/24/2013
    Location(s): Washington, Oregon
    Offices(s): Bonneville Power Administration

  • September 19, 2013

    Port Angeles-Sappho #1 Shelton-Kitsap #4 Access Roads
    CX(s) Applied: B1.3
    Date: 09/19/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • September 13, 2013

    Bell-Boundary Fiber Project
    CX(s) Applied: B4.7
    Date: 09/13/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • September 13, 2013

    Chehalis-Raymond Number 1 Access Road Maintenance
    CX(s) Applied: B1.3
    Date: 09/13/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • September 13, 2013

    Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Climate Change
    CX(s) Applied: B3.6
    Date: 09/13/2013
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory