You are here

Categorical Exclusion Determinations: Washington

Location

Categorical Exclusion Determinations issued for actions in Washington.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • October 14, 2015

    CHPRC Cleanup Actions
    CX(s) Applied: B6.1
    Date: 10/14/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • September 21, 2015

    Ross Warehouse Asbestos and Lead Paint Abatement
    CX(s) Applied: B1.16
    Date: 09/21/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 16, 2015

    Balancing Authority Area Services Agreement with Georgia-Pacific Consumer Products (Camas) LLC
    CX(s) Applied: B4.1
    Date: 09/16/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 15, 2015

    Pilot Proposal for Reducing the Cost of Carbon Dioxide Capture and Compression-Advanced Carbon Dioxide
    CX(s) Applied: B3.6
    Date: 09/15/2015
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • September 14, 2015

    Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation
    CX(s) Applied: B4.7
    Date: 09/14/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 10, 2015

    Snohomish Substation Equipment Replacement and Expansion Project
    CX(s) Applied: B4.11
    Date: 09/10/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 2, 2015

    Wautoma-Ostrander No. 1 Upgrade Project
    CX(s) Applied: B1.3, B4.6
    Date: 09/02/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • September 2, 2015

    Benton-Franklin #1 and Benton-Franklin #2 Wood Pole Replacement
    CX(s) Applied: B1.3
    Date: 09/02/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • August 26, 2015

    Bagley and Comarron Wireless Communication Facilities
    CX(s) Applied: B1.19
    Date: 08/26/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • August 26, 2015

    Taneum Creek Property Acquisition Funding
    CX(s) Applied: B1.25
    Date: 08/26/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • August 24, 2015

    Kennewick Radio Station HVAC Replacement
    CX(s) Applied: B1.4
    Date: 08/24/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • August 19, 2015

    Little Goose-Lower Granite #1 Fiber Repair Project
    CX(s) Applied: B1.3
    Date: 08/19/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • August 7, 2015

    Low-Cost, Efficient, and Durable High Temperature Wireless Sensors by Direct Write Additive Manufacturing for Application in Fossil Energy Systems
    CX(s) Applied: B3.6
    Date: 08/07/2015
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • August 6, 2015

    Approval of Land Use Review Request for Fiber Installation in BPA right-of-way in Skamania County, Washington
    CX(s) Applied: B4.9
    Date: 08/06/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 30, 2015

    North Bonneville-Ross Transmission Line Right-of-way Sale and Temporary Construction Permit - New Four Seasons Lane to 138th Ave. Segment
    CX(s) Applied: B1.24
    Date: 07/30/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 24, 2015

    Small-scale Renewable Energy Research and Development and Pilot Projects
    CX(s) Applied: B5.15
    Date: 07/24/2015
    Location(s): Washington
    Offices(s): Pacific Northwest Site Office

  • July 23, 2015

    Ellensburg Substation Expansion and Control House Addition
    CX(s) Applied: B4.11
    Date: 07/23/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 22, 2015

    Chehalis-Mayfield No. 1 Line Local Area Protection Scheme Project
    CX(s) Applied: B1.7, B2.2
    Date: 07/22/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 21, 2015

    Badger Canyon Substation Upgrades
    CX(s) Applied: B4.6
    Date: 07/21/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 21, 2015

    Ross-Lexington 12/2 Tower Stabilization Project
    CX(s) Applied: B1.3
    Date: 07/21/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 16, 2015

    Modified Thermoresponsive Hyperbranched Polymers for Improved Viscosity and Enhanced Lubricity of Engine Oils
    CX(s) Applied: A9
    Date: 07/16/2015
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • July 9, 2015

    Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line
    CX(s) Applied: B1.42
    Date: 07/09/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 8, 2015

    Washougal Vegetative Maintenance - LURR 20150160
    CX(s) Applied: B4.9
    Date: 07/08/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 2, 2015

    Longview Osmose 2015 Corrosion Mitigation and Repair Project
    CX(s) Applied: B1.3
    Date: 07/02/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 30, 2015

    Puget Sound Energy Fiber Connection
    CX(s) Applied: B1.42
    Date: 06/30/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration