Categorical Exclusion Determinations: Washington

Location

Categorical Exclusion Determinations issued for actions in Washington.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014
    CX(s) Applied: B1.4
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Support Buildings under 10 CFR 1021, Subpart D, Appendix B, B1.15 for Calendar Year 2014
    CX(s) Applied: B1.15
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Asbestos Removal under 10 CFR 1021, Subpart D, Appendix B, B1.16 for Calendar Year 2014
    CX(s) Applied: B1.16
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Polychlorinated Biphenyl Removal under 10 CFR 1021, Subpart D, Appendix B, B1.17 for Calendar Year 2014
    CX(s) Applied: B1.17
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Relocation of Buildings under 10 CFR 1021, Subpart D, Appendix B, B1.22 for Calendar Year 2014
    CX(s) Applied: B1.22
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2014
    CX(s) Applied: B1.27
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Installation or Relocation of Machinery and Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.31 for Calendar Year 2014
    CX(s) Applied: B1.31
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Traffic Flow Adjustments under 10 CFR 1021, Subpart D, Appendix B, B1.32 for Calendar Year 2014
    CX(s) Applied: B1.32
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 2, 2013

    Mission Support Alliance Annual Categorical Exclusion for Drop-Off, Collection, and Transfer Facilities for Recyclable Materials under 10 CFR 1021, Subpart D, Appendix B, B1.35 for Calendar Year 2014
    CX(s) Applied: B1.35
    Date: 12/02/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • November 26, 2013

    Ninemile Creek Lower Property Funding
    CX(s) Applied: B1.25
    Date: 11/26/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 26, 2013

    Wanacut Creek Upper Property Funding
    CX(s) Applied: B1.25
    Date: 11/26/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 25, 2013

    Aeneans Creek Spring Property Funding
    CX(s) Applied: B1.25
    Date: 11/25/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 22, 2013

    Covington District Culvert Replacements
    CX(s) Applied: B1.3
    Date: 07/22/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 21, 2013

    Managing Zirconium Chemistry and Phase Compatibility in Combined Process Separations for Minor Actinide Partitioning
    CX(s) Applied: B3.6
    Date: 11/21/2013
    Location(s): Washington
    Offices(s): Idaho Operations Office

  • November 19, 2013

    Grand Coulee-Bell No.5 Dead End Insulator Replacement Project
    CX(s) Applied: B1.3
    Date: 07/19/2013
    Location(s): Washington, Washington
    Offices(s): Bonneville Power Administration

  • November 12, 2013

    Insulator Replacement on North Bonneville-Midway No. 1 Transmission Line (update to previous CX issued 7/16/13)
    CX(s) Applied: B4.6
    Date: 11/12/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 8, 2013

    Grays River Confluence Property Funding
    CX(s) Applied: B1.25
    Date: 11/08/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 8, 2013

    Spectroscopy System for Teaching and Research
    CX(s) Applied: B1.31
    Date: 11/08/2013
    Location(s): Washington
    Offices(s): Idaho Operations Office

  • November 6, 2013

    Upgrade Six Wireless Communication Sites (Clear Creek, Evergreen, Fruit Valley, KSLM, Minnehaha, Popcorn)
    CX(s) Applied: B1.19
    Date: 11/06/2013
    Location(s): Oregon, Washington, Washington
    Offices(s): Bonneville Power Administration

  • November 5, 2013

    CH2MHill Plateau Remediation Company - Small-scale Research and Development, Laboratory Operations, and Pilot Projects, November 2013 to November 2014
    CX(s) Applied: B3.6
    Date: 11/05/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • November 1, 2013

    "Equipment Additions to the Ostrander and Pearl Substations and Dittmer Control Center

    CX(s) Applied: B1.7
    Date: 11/01/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration"

  • October 28, 2013

    Siting, Construction, and Operation of New Septic Tank, Drain Field and Fencing at the 400 Area Fast Flux Test Facility
    CX(s) Applied: B1.15
    Date: 10/28/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 15, 2013

    Usk-Boundary No. 1 Transmission Line Impairment Remediation
    CX(s) Applied: B1.3
    Date: 10/15/2013
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • October 10, 2013

    Balancing Authority Area Services Agreement with Port Townsend Paper Corporation
    CX(s) Applied: B4.1
    Date: 10/10/2013
    Location(s): Oregon, Washington
    Offices(s): Bonneville Power Administration

  • October 3, 2013

    Site Characterization and Environmental Monitoring for the Evaluation of Beryllium to Other Naturally Occurring Metals On and Near the Hanford Site
    CX(s) Applied: B3.1
    Date: 10/03/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office