You are here

Categorical Exclusion Determinations: Washington

Location

Categorical Exclusion Determinations issued for actions in Washington.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 31, 2015

    MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment
    CX(s) Applied: B1.4
    Date: 12/31/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 31, 2015

    MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services
    CX(s) Applied: B1.3
    Date: 12/31/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 31, 2015

    MSA Annual Categorical Exclusion for Transfer Actions
    CX(s) Applied: B1.30
    Date: 12/31/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 31, 2015

    MSA Annual Categorical Exclusion for Training Exercises and Simulations
    CX(s) Applied: B1.2
    Date: 12/31/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 31, 2015

    MSA Annual Categorical Exclusion for Electronic Equipment
    CX(s) Applied: B1.7
    Date: 12/31/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 29, 2015

    Project L-840: Export Water Line Replacement, 2901Y to 200W
    CX(s) Applied: B5.5
    Date: 12/29/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 29, 2015

    Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E
    CX(s) Applied: B5.5
    Date: 12/29/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 11, 2015

    Radio Upgrades at Franklin, Nine Mile, and Walla Walla Substations
    CX(s) Applied: B1.19
    Date: 12/11/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 7, 2015

    Haystack Butte Radio Communication Site
    CX(s) Applied: B1.19
    Date: 12/07/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 4, 2015

    Orchard Tree Planting within North Bonneville-Ross No. 1 Transmission Line corridor - LURR 20150270
    CX(s) Applied: B4.9
    Date: 12/04/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 2, 2015

    Ross-Lexington Transmission Line Corridor Lease for Horse Pasture and Garden
    CX(s) Applied: B4.9
    Date: 12/02/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • December 1, 2015

    Underwood Tap Structure Relocation
    CX(s) Applied: B4.13
    Date: 12/01/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 12, 2015

    Ross Complex Road Project
    CX(s) Applied: B1.32
    Date: 11/12/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 12, 2015

    Olympia Substation NERC-CIP Upgrade
    CX(s) Applied: B2.5
    Date: 11/12/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • November 6, 2015

    Washougal 17th St. and NE 380th Ave. Paving - LURR 20150442
    CX(s) Applied: B4.9
    Date: 11/06/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • October 27, 2015

    Cascadia Subduction Zone (CSZ) - Energy Emergency Response
    CX(s) Applied: A1, A9, A11
    Date: 10/27/2015
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • October 26, 2015

    Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation (update to previous CX issued September 14, 2015)
    CX(s) Applied: B4.7
    Date: 10/26/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • October 21, 2015

    Vantage Substation-Control House, Fire Detection and Alarm Installs
    CX(s) Applied: B2.2
    Date: 10/21/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • October 21, 2015

    Communication Equipment Removals (#WC Projects)
    CX(s) Applied: B1.19
    Date: 10/21/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • October 20, 2015

    Midway Substation Upgrades
    CX(s) Applied: B4.6
    Date: 10/20/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • October 14, 2015

    CHPRC Installation or Relocation of Machinery and Equipment
    CX(s) Applied: B1.31
    Date: 10/14/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 14, 2015

    CHPRC Asbestos Removal
    CX(s) Applied: B1.16
    Date: 10/14/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 14, 2015

    CHPRC Routine Maintenance
    CX(s) Applied: B1.3
    Date: 10/14/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 14, 2015

    CHPRC Cleanup Actions
    CX(s) Applied: B6.1
    Date: 10/14/2015
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • September 21, 2015

    Ross Warehouse Asbestos and Lead Paint Abatement
    CX(s) Applied: B1.16
    Date: 09/21/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration