You are here

Categorical Exclusion Determinations: Washington

Location

Categorical Exclusion Determinations issued for actions in Washington.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • March 18, 2016

    Reduction of System Cost Characteristics Through Innovative Solutions to Installation, Operations, and Maintenance
    Award Number: DE-EE0007347
    CX(s) Applied: A9
    Water Power Program br> Date: 03/18/2016
    Location(s): WA
    Office(s): Golden Field Office

  • March 11, 2016

    Survivability Enhancement of a Multi-Mode Point Absorber
    Award Number: DE-EE0007346
    CX(s) Applied: A9, B3.6
    Water Power Program
    Date: 03/10/2016
    Location(s): WA
    Office(s): Golden Field Office

  • March 4, 2016

    Geothermal Play-Fairway Analysis of Washington State Properties
    Award Number: DE-EE0006728
    CX(s) Applied: A9, B3.1
    Geothermal Technologies Office
    Date: 03/04/2016
    Location(s): WA
    Office(s): Golden Field Office

  • February 23, 2016

    Energy OutWest Peer Exchange
    Award Number: DE-EE0006298
    CX(s) Applied: A9, A11
    Weatherization & Intergovernmental Programs
    Date: 02/21/2014
    Location(s): WA
    Office(s): Golden Field Office

  • January 12, 2016

    Optimized Composite Prototype for Archimedes Turbine Manufacture
    Award Number: DE-EE0007427
    CX(s) Applied: A9, B3.6
    Water Power Technologies Office
    Date: 01/12/2016
    Location(s): IN
    Office(s): Golden Field Office

  • July 9, 2015

    Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line
    CX(s) Applied: B1.42
    Date: 07/09/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • July 8, 2015

    Washougal Vegetative Maintenance - LURR 20150160
    CX(s) Applied: B4.9
    Date: 07/08/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 30, 2015

    Puget Sound Energy Fiber Connection
    CX(s) Applied: B1.42
    Date: 06/30/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 25, 2015

    Ross Complex Sally Port Entrance Relocation
    CX(s) Applied: B4.7
    Date: 06/25/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 24, 2015

    Aberdeen Substation (Grays Harbor PUD) Tree Clearing
    CX(s) Applied: B1.32
    Date: 06/24/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 24, 2015

    St. Johns-St. Helens Transmission Line Access Road Improvements
    CX(s) Applied: B1.3
    Date: 06/24/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 24, 2015

    Frontier Observatory for Research in Geothermal Energy - Newberry Volcano, OR (Phase One)
    CX(s) Applied: A1, A9, A11
    Date: 06/24/2015
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • June 18, 2015

    Shelton-Fairmount No. 1 Switches Replacement Project
    CX(s) Applied: B1.3
    Date: 06/18/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 17, 2015

    Horn Rapids Tap Disconnect Additions
    CX(s) Applied: B4.6
    Date: 06/17/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 17, 2015

    Ellensburg-Moxee Line Impairment Correction
    CX(s) Applied: B4.11
    Date: 06/17/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 15, 2015

    Chehalis District Access Road Maintenance
    CX(s) Applied: B4.6
    Date: 06/15/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 11, 2015

    South Mountain Communication Site Back-up Generator Replacement
    CX(s) Applied: B1.3
    Date: 06/11/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 11, 2015

    Bellingham Substation Upgrades
    CX(s) Applied: B1.3
    Date: 06/11/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 10, 2015

    Fiscal Year 2015 Snohomish District Danger Pole Replacement Project (Update to previous CX issued 4/23/15)
    CX(s) Applied: B4.6
    Date: 06/10/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • June 4, 2015

    Hydro Research Foundation University Research Awards - HRF - Washington State University
    Award Number: DE-EE0002668/EE0006506
    CX(s) Applied: A9, B3.6
    Water Power Program
    Date: 06/04/2015
    Location(s): WA
    Office(s): Golden Field Office

  • June 4, 2015

    Generic Categorical Exclusion for Small-Scale Renewable Energy Research and Development and Pilot Projects in Aquatic Environments
    CX(s) Applied: B5.25
    Date: 06/04/2015
    Location(s): Washington
    Offices(s): Pacific Northwest Site Office

  • June 4, 2015

    Production, Quality Control and Shipment of Radionuclides from the University of Washington
    CX(s) Applied: B1.3
    Date: 06/04/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • May 29, 2015

    Carson Wireless Communication Site Fiber Upgrade
    CX(s) Applied: B4.7
    Date: 05/29/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration

  • May 29, 2015

    Renewable Acid-hydrolysis Condensation Hydrotreating (REACH) Pilot Plant
    Award Number: DE-EE0006244
    CX(s) Applied: A9, B3.6
    Bioenergy Technologies Office
    Date: 05/29/2015
    Location(s): WA
    Office(s): Golden Field Office

  • May 28, 2015

    Sea North Creek Wireless Communication Facility
    CX(s) Applied: B1.19
    Date: 05/28/2015
    Location(s): Washington
    Offices(s): Bonneville Power Administration