You are here

Categorical Exclusion Determinations: Strategic Petroleum Reserve Field Office

Categorical Exclusion Determinations issued by Strategic Petroleum Reserve Field Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • March 1, 2016

    Big Hill Remote Control for Pipeline Valve BH-3
    CX(s) Applied: B1.3
    Date: 03/01/2016
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 1, 2016

    API 653 Inspection of BMT-2 Prior to Conversion
    CX(s) Applied: B1.3
    Date: 03/01/2016
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 18, 2016

    Inspection and Repair of West Hackberry-Sun 42-Inch Crude Oil Pipeline
    CX(s) Applied: 0
    Date: 02/18/2016
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 29, 2016

    West Hackberry Rework 42-inch Crude Oil Pipeline Mainline Valves
    CX(s) Applied: B1.3
    Date: 01/29/2016
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 11, 2016

    Replace WHT-1 Flush Water and WHT-10 Seal Flush Tanks
    CX(s) Applied: B1.3
    Date: 01/11/2016
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 22, 2015

    Inspection and Repair of West Hackberry-LCMS 36-Inch Crude Oil Pipeline
    CX(s) Applied: B1.3
    Date: 12/22/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 22, 2015

    Replace Section of Bryan Hill 36-Inch Crude Oil Pipeline at Hillebrandt Bayou
    CX(s) Applied: B1.3
    Date: 12/22/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 15, 2015

    Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - GFE (BM-MM-1203A)
    CX(s) Applied: B1.3
    Date: 12/15/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 15, 2015

    Replace Oil Water Separators at Bryan Mound Caverns 1, 2, 4 and 5 - Install (BM-MM-1203)
    CX(s) Applied: B1.3
    Date: 12/15/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 8, 2015

    Replacement of Bayou Choctaw Deep Well Anode Ground Bed Sites (BC-OM-1472)
    CX(s) Applied: B1.3
    Date: 12/08/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 19, 2015

    Recap West Hackberry Anhydrite Ponds (WH-MM-1334)
    CX(s) Applied: B1.3
    Date: 11/19/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 19, 2015

    Install West Hackberry Crude Oil Pipeline Temperature Monitoring System (WH-MM-784)
    CX(s) Applied: B1.3
    Date: 11/19/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 11, 2015

    Clean Bryan Mound Crude Oil Tank, BMT-4 (BM-MM-738B)
    CX(s) Applied: B1.3
    Date: 11/11/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 4, 2015

    Replace West Hackberry Raw Water Injection Pump Discharge Piping and Recycle Line (WH-MM-1106)
    CX(s) Applied: B1.3
    Date: 11/04/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 1, 2015

    Deploy Wireless Guest Networks at Strategic Petroleum Reserve Sites
    CX(s) Applied: B1.7
    Date: 10/01/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 28, 2015

    Dredging of Bryan Mound Raw Water Intake Structure Inlet Channel
    CX(s) Applied: B1.3
    Date: 09/28/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 25, 2015

    ADAS Life Cycle Management Services, 2015-2020
    CX(s) Applied: B1.7
    Date: 09/25/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 21, 2015

    Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200)
    CX(s) Applied: B1.3
    Date: 09/21/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 31, 2015

    Replace Bryan Mound Crude Oil Closed Drain System at Meter Skid (BM-MM-805)
    CX(s) Applied: B1.3
    Date: 08/31/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 17, 2015

    Replace Critical Loop Transformers & Cables Damaged by Hurricane Ike
    CX(s) Applied: B1.3
    Date: 08/17/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Bayou Choctaw Wi-Fi/Radio Replacement Pilot
    CX(s) Applied: B1.7
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Install Packaged Central Heating, Ventilation and Air Conditioning Units for Bayou Choctaw Building 423
    CX(s) Applied: B1.4
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Replace Big Hill Critical Loop Transformers & Cables Damaged by Hurricane Ike
    CX(s) Applied: B1.3
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 10, 2015

    Big Hill Site Building Upgrades, Phase 2
    CX(s) Applied: B1.3
    Date: 08/10/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 3, 2015

    Replace 6" Piping at West Hackberry Disposal Wells
    CX(s) Applied: B1.3
    Date: 08/03/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office