DOCUMENTS AVAILABLE FOR DOWNLOAD

  • March 13, 2014

    Big Hill Anhydrite Pond Sampling and Analysis
    CX(s) Applied: B3.1
    Date: 09/23/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 28, 2013

    Bryan Mound Brine Disposal Pump Replacement (Install)
    CX(s) Applied: B5.2
    Date: 10/28/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 15, 2013

    West Hackberry RWIS Recycle Valve Upgrade
    CX(s) Applied: B1.3
    Date: 10/15/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 1, 2013

    Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18
    CX(s) Applied: B1.3
    Date: 10/01/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 17, 2013

    Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters Government Furnished Equipment
    CX(s) Applied: B5.2
    Date: 09/17/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 9, 2013

    Blast and Paint West Hackberry Meter Skid, Prover Piping and Structure
    CX(s) Applied: B1.3
    Date: 09/09/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 22, 2013

    Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines
    CX(s) Applied: B1.3
    Date: 08/22/2013
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 19, 2013

    Clean and Inspect West Hackberry T-15 Brine Tank
    CX(s) Applied: B1.3
    Date: 08/19/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 8, 2013

    Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install)
    CX(s) Applied: B1.3
    Date: 08/08/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 11, 2013

    Strategic Petroleum Reserve Computer Services, 2015-2020
    CX(s) Applied: B1.7
    Date: 07/11/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 9, 2013

    Replace Bayou Choctaw 500 KVA Power Transformer
    CX(s) Applied: B1.3
    Date: 07/09/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 3, 2013

    Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe
    CX(s) Applied: B5.2
    Date: 07/03/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 3, 2013

    Bryan Mound Brine Disposal Pump Replacement
    CX(s) Applied: B5.2
    Date: 07/03/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 28, 2013

    Replace Big Hill Circuit Breakers OCB-4009, 4010 and 4011
    CX(s) Applied: B1.33
    Date: 06/28/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 24, 2013

    Repair of Big Hill Texas-14 Transformer
    CX(s) Applied: B1.3
    Date: 06/24/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 24, 2013

    Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters
    CX(s) Applied: B5.2
    Date: 06/24/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 23, 2013

    Hydrogen Peroxide Treatment of Strategic Petroleum Reserve Heat Exchangers BOA
    CX(s) Applied: B1.3
    Date: 04/23/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 22, 2013

    Replace Brine Disposal System Header to West Hackberry Brine Tanks, Government Furnished Equipment
    CX(s) Applied: B1.3
    Date: 04/22/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 22, 2013

    Replace Brine Disposal System Header to West Hackberry Brine Tanks
    CX(s) Applied: B1.3
    Date: 04/22/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 16, 2013

    Purchase of Big Hill Control Valve Assembly
    CX(s) Applied: B1.3
    Date: 04/16/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 11, 2013

    Strategic Petroleum Reserve Site Workover Support Activities, 2016-2020
    CX(s) Applied: B5.12
    Date: 01/07/2013
    Location(s): CX: none
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 23, 2013

    Blast and Paint West Hackberry, Texas 22 Header Piping
    CX(s) Applied: B1.3
    Date: 01/23/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 7, 2013

    Video Inspection of Bryan Mound 36-inch Raw Water Pipeline
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 2, 2013

    Strategic Petroleum Reserve Site Subsidence Surveys, 2013-2017
    CX(s) Applied: B3.1
    Date: 01/02/2013
    Location(s): Louisiana, Texas, Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 18, 2012

    Repair and Line Bryan Mound Brine Tank, BMT-1
    CX(s) Applied: B1.3
    Date: 12/18/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office