You are here

Categorical Exclusion Determinations: Strategic Petroleum Reserve Field Office

Categorical Exclusion Determinations issued by Strategic Petroleum Reserve Field Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • March 11, 2013

    Strategic Petroleum Reserve Site Workover Support Activities, 2016-2020
    CX(s) Applied: B5.12
    Date: 01/07/2013
    Location(s): CX: none
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 23, 2013

    Blast and Paint West Hackberry, Texas 22 Header Piping
    CX(s) Applied: B1.3
    Date: 01/23/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 7, 2013

    Video Inspection of Bryan Mound 36-inch Raw Water Pipeline
    CX(s) Applied: B1.3
    Date: 01/07/2013
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 2, 2013

    Strategic Petroleum Reserve Site Subsidence Surveys, 2013-2017
    CX(s) Applied: B3.1
    Date: 01/02/2013
    Location(s): Louisiana, Texas, Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 18, 2012

    Repair and Line Bryan Mound Brine Tank, BMT-1
    CX(s) Applied: B1.3
    Date: 12/18/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 12, 2012

    Pumping System for 100 MBD Cavern Capacity Maintenance
    CX(s) Applied: B1.15
    Date: 12/12/2012
    Location(s): Texas, Louisiana, Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 11, 2012

    Replace Brine Disposal System Header to Bryan Mound Brine Tank, GFE
    CX(s) Applied: B1.3
    Date: 12/11/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 11, 2012

    Loss of a Major Transformer at Bryan Mound or West Hackberry
    CX(s) Applied: B1.3
    Date: 12/11/2012
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 26, 2012

    Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline
    CX(s) Applied: B5.2
    Date: 11/26/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 26, 2012

    Replace Bayou Choctaw Warehouse Firewater Piping
    CX(s) Applied: B1.3
    Date: 11/26/2012
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • November 5, 2012

    Alternate Source of Firewater at Bryan Mound
    CX(s) Applied: B5.2
    Date: 11/05/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 31, 2012

    Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install)
    CX(s) Applied: B1.7
    Date: 10/31/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 30, 2012

    Strategic Petroleum Reserve Emergency Pipeline and Piping Repair, 2013-2017
    CX(s) Applied: B5.4
    Date: 10/30/2012
    Location(s): CX: none
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 2, 2012

    ADAS System Life Cycle Support, 2012-2015
    CX(s) Applied: B1.7
    Date: 10/02/2012
    Location(s): CX: none
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 24, 2012

    Elmwood Dog Kennel Repair (Hurricane Isaac)
    CX(s) Applied: B1.3
    Date: 09/24/2012
    Location(s): CX: none
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 20, 2012

    Replace Sparge Piping at Bryan Mound Raw Water Intake Structure
    CX(s) Applied: B1.3
    Date: 09/20/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 18, 2012

    New Orleans Emergency Generator Installation (900 Building)
    CX(s) Applied: B1.31
    Date: 09/18/2012
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 14, 2012

    Big Hill Fence Extension Modifications
    CX(s) Applied: B1.11
    Date: 09/14/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 28, 2012

    Repair West Hackberry Brine Tanks, WHT-14 & WHT-15
    CX(s) Applied: B1.3
    Date: 08/28/2012
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 28, 2012

    Replace Brine Disposal System Header to Bryan Mound Brine Tank
    CX(s) Applied: B1.3
    Date: 08/28/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 23, 2012

    Replace Three Wood Poles-In-Kind at Bryan Mound West Gate
    CX(s) Applied: B1.3
    Date: 08/23/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 16, 2012

    Variable Frequency Drivers for Raw Water Intake Structure Pumps Government Furnished Equipment
    CX(s) Applied: B1.3
    Date: 08/16/2012
    Location(s): Texas, Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 14, 2012

    Dredging of the West Hackberry Raw Water Intake Structure
    CX(s) Applied: B1.3
    Date: 08/14/2012
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 6, 2012

    Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel
    CX(s) Applied: B1.3
    Date: 08/06/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 6, 2012

    Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment
    CX(s) Applied: B1.3
    Date: 08/06/2012
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office