Strategic Petroleum Reserve Site Workover Support Activities, 2016-2020
CX(s) Applied: B5.12
Date: 01/07/2013
Location(s): CX: none
Offices(s): Strategic Petroleum Reserve Field Office
Categorical Exclusion Determinations issued by Strategic Petroleum Reserve Field Office.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
March 11, 2013
-
January 23, 2013
Blast and Paint West Hackberry, Texas 22 Header Piping
CX(s) Applied: B1.3
Date: 01/23/2013
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
January 7, 2013
Video Inspection of Bryan Mound 36-inch Raw Water Pipeline
CX(s) Applied: B1.3
Date: 01/07/2013
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
January 2, 2013
Strategic Petroleum Reserve Site Subsidence Surveys, 2013-2017
CX(s) Applied: B3.1
Date: 01/02/2013
Location(s): Louisiana, Texas, Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
December 18, 2012
Repair and Line Bryan Mound Brine Tank, BMT-1
CX(s) Applied: B1.3
Date: 12/18/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
December 12, 2012
Pumping System for 100 MBD Cavern Capacity Maintenance
CX(s) Applied: B1.15
Date: 12/12/2012
Location(s): Texas, Louisiana, Texas
Offices(s): Strategic Petroleum Reserve Field Office -
December 11, 2012
Replace Brine Disposal System Header to Bryan Mound Brine Tank, GFE
CX(s) Applied: B1.3
Date: 12/11/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
December 11, 2012
Loss of a Major Transformer at Bryan Mound or West Hackberry
CX(s) Applied: B1.3
Date: 12/11/2012
Location(s): Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
November 26, 2012
Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline
CX(s) Applied: B5.2
Date: 11/26/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
November 26, 2012
Replace Bayou Choctaw Warehouse Firewater Piping
CX(s) Applied: B1.3
Date: 11/26/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
November 5, 2012
Alternate Source of Firewater at Bryan Mound
CX(s) Applied: B5.2
Date: 11/05/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
October 31, 2012
Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install)
CX(s) Applied: B1.7
Date: 10/31/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
October 30, 2012
Strategic Petroleum Reserve Emergency Pipeline and Piping Repair, 2013-2017
CX(s) Applied: B5.4
Date: 10/30/2012
Location(s): CX: none
Offices(s): Strategic Petroleum Reserve Field Office -
October 2, 2012
ADAS System Life Cycle Support, 2012-2015
CX(s) Applied: B1.7
Date: 10/02/2012
Location(s): CX: none
Offices(s): Strategic Petroleum Reserve Field Office -
September 24, 2012
Elmwood Dog Kennel Repair (Hurricane Isaac)
CX(s) Applied: B1.3
Date: 09/24/2012
Location(s): CX: none
Offices(s): Strategic Petroleum Reserve Field Office -
September 20, 2012
Replace Sparge Piping at Bryan Mound Raw Water Intake Structure
CX(s) Applied: B1.3
Date: 09/20/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
September 18, 2012
New Orleans Emergency Generator Installation (900 Building)
CX(s) Applied: B1.31
Date: 09/18/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
September 14, 2012
Big Hill Fence Extension Modifications
CX(s) Applied: B1.11
Date: 09/14/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
August 28, 2012
Repair West Hackberry Brine Tanks, WHT-14 & WHT-15
CX(s) Applied: B1.3
Date: 08/28/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
August 28, 2012
Replace Brine Disposal System Header to Bryan Mound Brine Tank
CX(s) Applied: B1.3
Date: 08/28/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
August 23, 2012
Replace Three Wood Poles-In-Kind at Bryan Mound West Gate
CX(s) Applied: B1.3
Date: 08/23/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
August 16, 2012
Variable Frequency Drivers for Raw Water Intake Structure Pumps Government Furnished Equipment
CX(s) Applied: B1.3
Date: 08/16/2012
Location(s): Texas, Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
August 14, 2012
Dredging of the West Hackberry Raw Water Intake Structure
CX(s) Applied: B1.3
Date: 08/14/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
August 6, 2012
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel
CX(s) Applied: B1.3
Date: 08/06/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office -
August 6, 2012
Lower Big Hill 36” Crude Oil Pipeline at the Needmore Diversion Channel Government Furnished Equipment
CX(s) Applied: B1.3
Date: 08/06/2012
Location(s): Texas
Offices(s): Strategic Petroleum Reserve Field Office