Categorical Exclusion Determinations: Strategic Petroleum Reserve Field Office

Categorical Exclusion Determinations issued by Strategic Petroleum Reserve Field Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • August 17, 2015

    Replace Critical Loop Transformers & Cables Damaged by Hurricane Ike
    CX(s) Applied: B1.3
    Date: 08/17/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Bayou Choctaw Wi-Fi/Radio Replacement Pilot
    CX(s) Applied: B1.7
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Install Packaged Central Heating, Ventilation and Air Conditioning Units for Bayou Choctaw Building 423
    CX(s) Applied: B1.4
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 12, 2015

    Replace Big Hill Critical Loop Transformers & Cables Damaged by Hurricane Ike
    CX(s) Applied: B1.3
    Date: 08/12/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 10, 2015

    Big Hill Site Building Upgrades, Phase 2
    CX(s) Applied: B1.3
    Date: 08/10/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 3, 2015

    Replace 6" Piping at West Hackberry Disposal Wells
    CX(s) Applied: B1.3
    Date: 08/03/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 3, 2015

    Replace Windows on Big Hill and Bryan Mound Entry Portal Buildings
    CX(s) Applied: B1.3
    Date: 08/03/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 17, 2015

    Replace Bayou Choctaw Brine Disposal/Recycle Piping in Pump/Pond Area
    CX(s) Applied: B1.3
    Date: 07/17/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 6, 2015

    Clean Bryan Mound Crude Oil Tank, BMT-4
    CX(s) Applied: B1.3
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 6, 2015

    BH Anhydrite Pond Chlorides Wash - Pilot Test and Full Pond Chlorides Wash
    CX(s) Applied: B1.3
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 6, 2015

    BH Anhydrite Pond Sample Collection and Analysis - Pilot Test and Full Pond Chlorides Wash
    CX(s) Applied: B1.3
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 6, 2015

    Remove Oil from Bryan Mound Crude Oil Tank BMT-4 Sump
    CX(s) Applied: B1.3
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 27, 2015

    Repair Bayou Choctaw Brine Disposal Road (LANG and Subcontractor)
    CX(s) Applied: B1.3
    Date: 05/27/2015
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 18, 2015

    Very Early Smoke Detection Apparatus (All SPR Sites)
    CX(s) Applied: B2.2
    Date: 05/18/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 22, 2015

    Replace High Voltage Primary Bushings for GHTX-14 at RWIS
    CX(s) Applied: B1.3
    Date: 04/22/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 7, 2015

    AFFF System Replacement at Bayou Choctaw, Big Hill and West Hackberry
    CX(s) Applied: B1.3
    Date: 04/07/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 24, 2015

    Re-coat WHT-15 Brine Tank (WH-MM-819D)
    CX(s) Applied: B1.3
    Date: 03/24/2015
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 18, 2015

    Convert BMT-4 to External Floating Roof Tank (BM-MM-740) (BMT-4)
    CX(s) Applied: B1.3
    Date: 03/18/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 18, 2015

    Replace Screen Wash Piping, Discharge Header & Recycle Line at West Hackberry RWIS (WH-MM-1105)
    CX(s) Applied: B1.3
    Date: 03/18/2015
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 9, 2015

    Replace 24" West Hackberry Brine Disposal Pipeline (GFE) (WH-MM-826A)
    CX(s) Applied: B1.3
    Date: 03/09/2015
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 23, 2015

    LIBS, Laser Ablation, Glow Discharge Studies
    CX(s) Applied: B1.3
    Date: 02/23/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 23, 2015

    Maintenance Clean the Big Hill Raw Water Intake Structure Pump Bay (GH-OM-1167)
    CX(s) Applied: B1.3
    Date: 02/23/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 18, 2015

    Record of Categorical Exclusion Determination to Replace Piping Header at Bryan Mound RWIS and RWIP (BM-MM-1027)
    CX(s) Applied: B1.3
    Date: 02/18/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 26, 2015

    Big Hill Anhydrite Pond 9 Closure
    CX(s) Applied: B1.23
    Date: 01/26/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 13, 2015

    Close Big Hill Anhydrite Pond 9- Pilot Test Temporary Pipe Re-route
    CX(s) Applied: B3.6
    Date: 01/13/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office