Categorical Exclusion Determinations issued by Strategic Petroleum Reserve Field Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • July 17, 2015

    Replace Bayou Choctaw Brine Disposal/Recycle Piping in Pump/Pond Area
    CX(s) Applied: B1.3
    Date: 07/17/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 6, 2015

    Clean Bryan Mound Crude Oil Tank, BMT-4
    CX(s) Applied: B1.3
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 6, 2015

    BH Anhydrite Pond Chlorides Wash - Pilot Test and Full Pond Chlorides Wash
    CX(s) Applied: B1.3
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 6, 2015

    BH Anhydrite Pond Sample Collection and Analysis - Pilot Test and Full Pond Chlorides Wash
    CX(s) Applied: B1.3
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 6, 2015

    Remove Oil from Bryan Mound Crude Oil Tank BMT-4 Sump
    CX(s) Applied: B1.3
    Date: 07/06/2015
    Location(s): None Provided
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 27, 2015

    Repair Bayou Choctaw Brine Disposal Road (LANG and Subcontractor)
    CX(s) Applied: B1.3
    Date: 05/27/2015
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 18, 2015

    Very Early Smoke Detection Apparatus (All SPR Sites)
    CX(s) Applied: B2.2
    Date: 05/18/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 22, 2015

    Replace High Voltage Primary Bushings for GHTX-14 at RWIS
    CX(s) Applied: B1.3
    Date: 04/22/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 7, 2015

    AFFF System Replacement at Bayou Choctaw, Big Hill and West Hackberry
    CX(s) Applied: B1.3
    Date: 04/07/2015
    Location(s): Multiple Locations
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 24, 2015

    Re-coat WHT-15 Brine Tank (WH-MM-819D)
    CX(s) Applied: B1.3
    Date: 03/24/2015
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 18, 2015

    Convert BMT-4 to External Floating Roof Tank (BM-MM-740) (BMT-4)
    CX(s) Applied: B1.3
    Date: 03/18/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 18, 2015

    Replace Screen Wash Piping, Discharge Header & Recycle Line at West Hackberry RWIS (WH-MM-1105)
    CX(s) Applied: B1.3
    Date: 03/18/2015
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • March 9, 2015

    Replace 24" West Hackberry Brine Disposal Pipeline (GFE) (WH-MM-826A)
    CX(s) Applied: B1.3
    Date: 03/09/2015
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 23, 2015

    LIBS, Laser Ablation, Glow Discharge Studies
    CX(s) Applied: B1.3
    Date: 02/23/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 23, 2015

    Maintenance Clean the Big Hill Raw Water Intake Structure Pump Bay (GH-OM-1167)
    CX(s) Applied: B1.3
    Date: 02/23/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • February 18, 2015

    Record of Categorical Exclusion Determination to Replace Piping Header at Bryan Mound RWIS and RWIP (BM-MM-1027)
    CX(s) Applied: B1.3
    Date: 02/18/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 26, 2015

    Big Hill Anhydrite Pond 9 Closure
    CX(s) Applied: B1.23
    Date: 01/26/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 13, 2015

    Close Big Hill Anhydrite Pond 9- Pilot Test Temporary Pipe Re-route
    CX(s) Applied: B3.6
    Date: 01/13/2015
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 3, 2014

    BHP-3 Offsite Bump Repair
    CX(s) Applied: B1.3
    Date: 41885
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 2, 2014

    Replace Windows of Bryan Mound Portal Building #281
    CX(s) Applied: B1.3
    Date: 41884
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 29, 2014

    Replace West Hackberry Radio Tower
    CX(s) Applied: B1.19
    Date: 41880
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 29, 2014

    Hydrogen Sulfide Scavenger BOA (Multiple)
    CX(s) Applied: B5.2
    Date: 41880
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 27, 2014

    Convert BMT-2 to External Floating Roof Tank
    CX(s) Applied: B1.3
    Date: 41878
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 18, 2014

    Direct Assessment and Repair of BH-SUN 36-inch Crude Oil Pipeline
    CX(s) Applied: B5.4
    Date: 41869
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 30, 2014

    Install Single Split System Air Conditioning Unit in Bryan Mound Building No. 281 (BM-OM-1229)
    CX(s) Applied: B1.4
    Date: 06/30/2014
    Location(s): Texas
    Offices(s): Strategic Petroleum Reserve Field Office