Operation and maintenance of the LECO Carbon/Sulfur and Oxygen/Nitrogen/Hydrogen determinator. These methods determine the concentration of oxygen/…
Install digital signage in 731-N outside of room 132.…
This scope of work covers the renovation of the System One section of building 717-5N.…
Paint well water piping and components at 905-119H.…
Install fiber cables between buildings 703-1B and 730-2B.…
703-1B and 730-1B Install fiber cables between buildings.…
703-A Evaluate/Correct broken glass in windows…
Instrument Air System for Building 234-H are reaching their end of life and must be replaced. Replacement parts are no longer available.…
The Classified HANM D/3 Distributed Control Systems (DCS) (Production, Development, and Training) are currently running D/3 version 15.2 on Windows…
The proposed design change will replace the existing regulator manifold with the Matheson 53 Series mounting manifold, a Concoa Series 213 dual-sta…