You are here

Categorical Exclusion Determinations: Savannah River Operations Office

Categorical Exclusion Determinations issued by Savannah River Operations Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 3, 2013

    Subcontractor Repair of Roof at 704-1N
    CX(s) Applied: B1.3
    Date: 09/03/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 29, 2013

    Extraction-Scrub-Strip Testing with Modular Caustic Side Solvent Extraction Unit Solvents
    CX(s) Applied: B3.6
    Date: 08/29/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2013

    Subcontractor Will Provide Roof Repairs at 751-1A
    CX(s) Applied: B1.3
    Date: 08/27/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2013

    Subcontractor Will Provide Roof Repairs at 751-1A
    CX(s) Applied: B1.3
    Date: 08/27/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2013

    105-L Transfer Bay Drainage Repair
    CX(s) Applied: B1.3
    Date: 08/27/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2013

    Operation of Thermogravimetric Analysis and Mass Spectrometer in Savannah River National Laboratory Glove Box-41, Laboratory C-159/163
    CX(s) Applied: B3.6
    Date: 08/27/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2013

    Subcontractor Will Provide Roof Repairs at 735-17A
    CX(s) Applied: B1.3
    Date: 08/27/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2013

    Subcontractor Will Provide Roof Repairs at 781-A
    CX(s) Applied: B1.3
    Date: 08/27/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2013

    Subcontractor Will Provide Roof Repairs at 705-A
    CX(s) Applied: B1.3
    Date: 08/27/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 23, 2013

    Rapid Prototyping Machines Support Research and Development
    CX(s) Applied: B3.6
    Date: 08/23/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 21, 2013

    Replace River Water Pelton Valves and Remove Existing Valve Houses
    CX(s) Applied: B1.3.
    Date: 08/21/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 21, 2013

    Subcontractor Repair of Leaks over Rooms 12, 15, Hallway at 772-25B
    CX(s) Applied: B1.3
    Date: 08/21/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 20, 2013

    Subcontractor Repair of Roof Leaks at 716-N
    CX(s) Applied: B1.3
    Date: 08/20/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 20, 2013

    Subcontractor Repair of Roof Leaks at 704-3N
    CX(s) Applied: B1.3
    Date: 08/20/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 20, 2013

    Subcontractor Repair of Roof Leaks at 773-A
    CX(s) Applied: B1.3
    Date: 08/20/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 20, 2013

    Roadway Rights-of-way Maintenance
    CX(s) Applied: B1.3
    Date: 08/20/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 16, 2013

    Subcontractor Repair of Roof Leaks at the South End of 722-4A
    CX(s) Applied: B1.3
    Date: 08/16/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 16, 2013

    Subcontractor Repair of Roof at 773-51A
    CX(s) Applied: B1.3
    Date: 08/16/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 16, 2013

    Subcontractor Repair of Roof Leaks at 730-2B
    CX(s) Applied: B1.3
    Date: 08/16/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 16, 2013

    Nonproliferation Technology Section - Nanomaterials Research
    CX(s) Applied: B3.6
    Date: 08/16/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 16, 2013

    Mercury Probe and Sampler Testing
    CX(s) Applied: B3.6
    Date: 08/16/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 13, 2013

    Remove Existing Asphalt Islands and Re-stripe C-Road
    CX(s) Applied: B1.3
    Date: 08/13/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 13, 2013

    Subcontractor Repair of Roof Leaks above Cubicles 139/144 in 705-K
    CX(s) Applied: B1.3
    Date: 08/13/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 13, 2013

    Operation of Zeiss Sigma Variable Pressure Scanning Electron Microscope
    CX(s) Applied: B3.6
    Date: 08/13/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 13, 2013

    Groundwater Characterization and Well Installation at the P-Area Reactor-Groundwater Operable Unit
    CX(s) Applied: B3.1
    Date: 08/13/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office