Categorical Exclusion Determinations: Savannah River Operations Office

Categorical Exclusion Determinations issued by Savannah River Operations Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 23, 2013

    Subcontractor Repair of Roof Leaks at 705-H
    CX(s) Applied: B1.3
    Date: 09/23/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 23, 2013

    Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142
    CX(s) Applied: B3.6
    Date: 09/23/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 19, 2013

    Installation of Manway to H-Canyon Exhaust Tunnel
    CX(s) Applied: B2.5
    Date: 09/19/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 19, 2013

    Install Nitrogen Analyzer in 772-F, Lab 175, Glovebox #1
    CX(s) Applied: B3.6
    Date: 09/19/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 19, 2013

    Install One (1) Universal Wiring Drop on West End Wall in the 704-L Cafeteria
    CX(s) Applied: B1.3
    Date: 09/19/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 19, 2013

    Install Blinds in 704-L Cafeteria
    CX(s) Applied: B1.3
    Date: 09/19/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 19, 2013

    Subcontractor Repair of Roof Leaks at 773-A, B-Wing
    CX(s) Applied: B1.3
    Date: 09/19/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 19, 2013

    HTRL Isotope Separation and General R&D
    CX(s) Applied: B3.6
    Date: 09/19/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 17, 2013

    DWPF Precipitate Reactor Feed Tank (PRFT) and 512-S Sample Analysis
    CX(s) Applied: B3.6
    Date: 09/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 17, 2013

    Vacuum System Testing for 235-F Risk Reduction Project
    CX(s) Applied: B3.6
    Date: 09/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 13, 2013

    Infrastructure Modification for the Mobile Plutonium Facility (MPF) at the 645-N Complex
    CX(s) Applied: B1.15
    Date: 09/13/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 13, 2013

    Fabrication and Testing of a Hydrogen Generation Rate Apparatus
    CX(s) Applied: B3.6
    Date: 09/13/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 12, 2013

    Repair Domestic Water Leak at SFP Facilities
    CX(s) Applied: B1.3
    Date: 09/12/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 11, 2013

    Dissolution of Thorium Metal with Evaluation of Gas Generation and Evaluation for the Neutralization of Sodium Reactor Experiment (SRE) Fuel Simulant
    CX(s) Applied: B3.6
    Date: 09/11/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 11, 2013

    Subcontractor Repair of Roof Leaks at 749-A
    CX(s) Applied: B1.3
    Date: 09/11/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 10, 2013

    484-17D Coal Yard Remediation
    CX(s) Applied: B6.1
    Date: 06/07/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 9, 2013

    Piezometer Installation at 488-1D and 488-2D
    CX(s) Applied: B3.1
    Date: 09/09/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 9, 2013

    Subcontractor Repair of Roof Leaks at 707-7F
    CX(s) Applied: B1.3
    Date: 09/09/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 9, 2013

    Receipt, Unloading, and Movement of Radioactive Samples in Support of the 3013 Pu Surveillance Program
    CX(s) Applied: B3.6
    Date: 09/09/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 9, 2013

    Subcontractor Repair of Roof Leaks at 776-6A
    CX(s) Applied: B1.3
    Date: 09/09/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 9, 2013

    Subcontractor Repair of Roof Leaks at 735-A
    CX(s) Applied: B1.3
    Date: 09/09/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 9, 2013

    Subcontractor Repair of Roof Leaks at 773-43A
    CX(s) Applied: B1.3
    Date: 09/09/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 9, 2013

    Modular Caustic Side Solvent Extraction (MCU) Improved Solvent Testing
    CX(s) Applied: B3.6
    Date: 09/09/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 5, 2013

    Subcontractor Repair of Roof at 722-5A
    CX(s) Applied: B1.3
    Date: 09/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 5, 2013

    Subcontractor Repair of Roof Leaks at 705-C
    CX(s) Applied: B1.3
    Date: 09/05/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office