Categorical Exclusion Determinations: Savannah River Operations Office

Categorical Exclusion Determinations issued by Savannah River Operations Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • August 31, 2015

    Subcontractor Will Replace the Roof at 702-H
    CX(s) Applied: B1.3
    Date: 08/31/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 31, 2015

    Prepping/Painting Exterior Walls of 105-K, 704-K
    CX(s) Applied: B1.3
    Date: 08/31/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    Sample Analysis Using Autosorb iQ Instrument
    CX(s) Applied: B3.6
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    Relocate 237-H MAC into 248-H
    CX(s) Applied: B1.15
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    Environmental Stress-Cracking Resistance Testing (ASTM D1693)
    CX(s) Applied: B3.6
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    Waste Minimization - Column Waste Recycle to Dissolver
    CX(s) Applied: B3.6
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    Subcontractor Will Provide Wall Repairs at 773-52A
    CX(s) Applied: B1.3
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    Roof Repairs at 735-A,D-105, -117, -119
    CX(s) Applied: B1.3
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    Subcontractor Will Provide Roof Repairs at 703-46A
    CX(s) Applied: B1.3
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    Subcontractor Will Provide Roof Repairs at 716-N
    CX(s) Applied: B1.3
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 27, 2015

    A-Area Antenna Field Restoration - 623-30G
    CX(s) Applied: B1.19
    Date: 08/27/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 25, 2015

    Replace Saltstone Disposal Unit 3/5 Diverter Valve Spool Piece
    CX(s) Applied: B1.3
    Date: 08/25/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 25, 2015

    Install Electrical Receptacles in K-Area Ballistic Resistant Enclosures (BREs)
    CX(s) Applied: B2.5
    Date: 08/25/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 25, 2015

    Work Performed in the Glass Apparatus Lab
    CX(s) Applied: B3.6
    Date: 08/25/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 24, 2015

    Dissolution of U-Al alloy and Th metal with Evaluation of Gas Generation and Evaluation for the Neutralization of Sodium Reactor Experiment (SRE) Fuel Simulant
    CX(s) Applied: B3.6
    Date: 08/24/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 24, 2015

    Routine Modular Caustic Side Solvent Extraction Unit ( MCU) Support Work
    CX(s) Applied: B3.6
    Date: 08/24/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 24, 2015

    Low Activity Waste Pretreatment Resin Removal Testing
    CX(s) Applied: B3.6
    Date: 08/24/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 20, 2015

    Replace the Bartex Level Instrumentation for HB-Line Tanks NT-31/32 With Radar Level Instrumentation
    CX(s) Applied: B2.5
    Date: 08/20/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 20, 2015

    Salt Batch 9 Feed Qualification
    CX(s) Applied: B3.6
    Date: 08/20/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 20, 2015

    Development of Dual Purpose Organic Semiconductor Thin Films for Polymer Interface and Electrostatic Applications
    CX(s) Applied: B3.6
    Date: 08/20/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 18, 2015

    Alloy Screening for High Temperature Thermally Decomposed HNO3 Exposure
    CX(s) Applied: B3.6
    Date: 08/18/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 14, 2015

    Re-Design Ballistic Resistance Enclosure (BRE) Overhead Hatch
    CX(s) Applied: B2.5
    Date: 08/14/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 14, 2015

    Discharge Assisted Digestion
    CX(s) Applied: B3.6
    Date: 08/14/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 14, 2015

    Relocate 108-1K Compressed Air System Oil / Water Separator Tank to Allow Improved Condensate Drainage
    CX(s) Applied: B2.1
    Date: 08/14/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 13, 2015

    735-A, D-Wing, Main Floor - ARGUS and ANSUL Halon Suppression Systems Replacement
    CX(s) Applied: B2.5
    Date: 08/13/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office