Categorical Exclusion Determinations: Savannah River Operations Office

Categorical Exclusion Determinations issued by Savannah River Operations Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • January 5, 2015

    Subcontractor Will Provide Roof Repairs at 707-7F
    CX(s) Applied: B1.3
    Date: 01/05/2015
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 15, 2014

    Subcontractor Will Provide Roof Repairs at 716-N
    CX(s) Applied: B1.3
    Date: 12/15/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 15, 2014

    Magnesium Chloride Testing
    CX(s) Applied: B3.6
    Date: 12/15/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 15, 2014

    Repainting Portions of 902-1F and 902-2F Fire Water Storage Tanks
    CX(s) Applied: B1.3
    Date: 12/15/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 11, 2014

    Inhibited Water Header Drain Addition on Tank 11 and Tank 15
    CX(s) Applied: B1.3
    Date: 12/11/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 10, 2014

    Removal of Leaked Normal Cooling Water (NCW) on 1st Level
    CX(s) Applied: B1.3
    Date: 12/10/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 10, 2014

    Control of Algae at the 281-8H Basin
    CX(s) Applied: B1.6
    Date: 12/10/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 10, 2014

    Cast Stone Testing Using Tank 50
    CX(s) Applied: B3.6
    Date: 12/10/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 9, 2014

    Canada Target Residue Material (CANTRM) Mock-up and Test
    CX(s) Applied: B3.6
    Date: 12/09/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 9, 2014

    Testing Soils/Sediments for "Available Reducing Capacity"
    CX(s) Applied: B3.6
    Date: 12/09/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 9, 2014

    Roof Repairs at 773-A, E-114
    CX(s) Applied: B1.3
    Date: 12/09/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 8, 2014

    Plant Accumulators Study
    CX(s) Applied: B3.6
    Date: 12/08/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 8, 2014

    Strippable Coatings
    CX(s) Applied: B3.6
    Date: 12/08/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 8, 2014

    Characterization of SRS Tank Farm Liquid, Salt cake, and Dilute Slurry Samples
    CX(s) Applied: B3.6
    Date: 12/08/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 8, 2014

    702-2A Heating, Ventilation, and Air Conditioning (HVAC) Installation
    CX(s) Applied: B1.3
    Date: 12/08/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 8, 2014

    Basin Modifications to Receive Research Fuel
    CX(s) Applied: B2.5
    Date: 12/08/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 4, 2014

    Subcontractor Will Provide Roof Repairs at 238-H
    CX(s) Applied: B1.3
    Date: 12/04/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 4, 2014

    Moisture Retention Testing of Saltstone Grouts, Cementitious Samples, Soil Samples, and Sediment Samples
    CX(s) Applied: B3.6
    Date: 12/04/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 4, 2014

    Reroute 221-S Gas Chromatograph Common Return Line per J-DCF-S-03003
    CX(s) Applied: B1.3
    Date: 12/04/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 3, 2014

    Disposition of Empty Compressed Gas Cylinders Containing Instrument Calibration Gas
    CX(s) Applied: B1.3
    Date: 12/03/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 2, 2014

    Dissolution Thorium Metal with Evaluation of Gas Generation and Evaluation for the Neutralization of Sodium Reactor Experiment (SRE) Fuel Simulant
    CX(s) Applied: B3.6
    Date: 12/02/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 2, 2014

    Motor Silencer Installation
    CX(s) Applied: B1.21
    Date: 12/02/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 2, 2014

    Remove Flammable Gas Monitor
    CX(s) Applied: B1.3
    Date: 12/02/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 2, 2014

    Development for Hydrogen Storage and Neutron Conversion Materials in 999-2W
    CX(s) Applied: B3.6
    Date: 12/02/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 2, 2014

    The Fixed Length Transfer Jet in Tank 47 Will Be Removed and Used to Fabricate a New Spare Fixed Length Transfer Jet
    CX(s) Applied: B1.3
    Date: 12/02/2014
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office