DOCUMENTS AVAILABLE FOR DOWNLOAD

  • July 17, 2014

    Repair Telecom Cabling to H-Area Wind Tower 614-50G
    CX(s) Applied: B1.3
    Date: 41837
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 15, 2014

    HB-Line Security Upgrades
    CX(s) Applied: B1.3
    Date: 41835
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 15, 2014

    Fabrication/Maintenance Shop and Environmental Test Activities in the SRNL Nonproliferation Technologies Section Engineering Laboratories
    CX(s) Applied: B3.6
    Date: 41835
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 15, 2014

    Grit Blasting
    CX(s) Applied: B3.6
    Date: 41835
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 15, 2014

    Obtain Samples for Potential D-Area Borrow Sources (Revision 1: Develop Borrow Pit 6 and Haul Roads)
    CX(s) Applied: B6.1
    Date: 41835
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 9, 2014

    Western Sector Characterization Soil Borings and Groundwater Monitoring Well Installation, Phase III
    CX(s) Applied: B3.1
    Date: 41829
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 9, 2014

    K Area Complex (KAC) Chilled Water System Upgrade
    CX(s) Applied: B2.1
    Date: 41829
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 9, 2014

    Subcontractor Repair of Roof Leaks at Building 105-L (+34 Near/Farside)
    CX(s) Applied: B1.3
    Date: 41829
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 9, 2014

    Routine Samples from the ARP/MCU System
    CX(s) Applied: B3.6
    Date: 41829
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 9, 2014

    Subcontractor Replacement of the Roof at Building 773-A, Rooms E172 and E174
    CX(s) Applied: B1.3
    Date: 41829
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 7, 2014

    Replace ETP Reverse Osmosis (RO) Cooling Towers (CTWs) and Add a Chemical Addition System
    CX(s) Applied: B1.5
    Date: 41827
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 7, 2014

    Installation of Portable Executive Restroom Trailer - S-Area
    CX(s) Applied: B1.15
    Date: 41827
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 7, 2014

    Replace 707-C Emergency Diesel Generator (SRO 7850)
    CX(s) Applied: B1.3
    Date: 41827
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 7, 2014

    Subcontractor Repair of Roof Leaks at Building 705-H, Rooms 28 and 64
    CX(s) Applied: B1.3
    Date: 41827
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 3, 2014

    Metallurgical Laboratory (Met Lab) Hazardous Waste Management Facility (HWMF) Vadose Zone Remedial Characterization
    CX(s) Applied: B3.1
    Date: 41823
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 30, 2014

    Sorption of Humate onto SRS Sediment
    CX(s) Applied: B3.6
    Date: 41820
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 30, 2014

    Modifications Required on Tanks 13 and 15
    CX(s) Applied: B1.3
    Date: 41820
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 30, 2014

    Understanding Relationships Between Low Level Metal Influx, Remediated Sediments, and Biological Receptors
    CX(s) Applied: B3.6
    Date: 41820
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 24, 2014

    High Pressure Methane/Natural Gas Cycling for the ARPA-E MOVE Project
    CX(s) Applied: B3.6
    Date: 41814
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 24, 2014

    Western Groundwater Seepline and Surface Water Sampling Locations
    CX(s) Applied: B3.1
    Date: 41814
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 20, 2014

    Preparing of Environmental Samples for Analysis
    CX(s) Applied: B3.6
    Date: 41810
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 20, 2014

    Replacement Air Dryer for the HB-Line Breathing Air System
    CX(s) Applied: B1.3
    Date: 41810
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 19, 2014

    Establish 0.1 mg/L Cu as a target value for the ETP H Retention Basin (HRB) influent per a deviation to the ETP Waste Acceptance Criteria (WAC).
    CX(s) Applied: B3.1
    Date: 41809
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 18, 2014

    Process Water Instrument Air System Reconfiguration at 284-H
    CX(s) Applied: B1.3
    Date: 41808
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 17, 2014

    Remove Two Sets of Railroad Tracks on Road D in A-Area
    CX(s) Applied: B1.3
    Date: 41807
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office