  • August 12, 2014

    Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building
    CX(s) Applied: B1.15
    Date: 41863
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 12, 2014

    Alternative Chemical Cleaning for Sludge Heel Removal and MCU Oxalate and Aluminate Solubility - Simulant Nonrad Testing
    CX(s) Applied: B3.6
    Date: 41863
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 12, 2014

    Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building
    CX(s) Applied: B1.15
    Date: 41863
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 12, 2014

    Alternative Chemical Cleaning for Sludge Heel Removal and MCU Oxalate and Aluminate Solubility - Simulant Nonrad Testing
    CX(s) Applied: B3.6
    Date: 41863
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 11, 2014

    H-Area Vehicle Barrier Installation
    CX(s) Applied: B1.15
    Date: 41862
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 11, 2014

    Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building
    CX(s) Applied: B1.15
    Date: 41862
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 11, 2014

    H-Area Vehicle Barrier Installation
    CX(s) Applied: B1.15
    Date: 41862
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 11, 2014

    Install Elevated Fire Water Storage Tank
    CX(s) Applied: B2.5
    Date: 41862
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 11, 2014

    Installation of H-Canyon 294-1H Process Air Supply Tunnel Manway Building
    CX(s) Applied: B1.15
    Date: 41862
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 7, 2014

    SRNL C-041 Control Room Alarms (CHEX, OGE, CE) Upgrade (Wireless)
    CX(s) Applied: B1.3
    Date: 41858
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 7, 2014

    SRNL C-041 Control Room Alarms (CHEX, OGE, CE) Upgrade (Wireless)
    CX(s) Applied: B1.3
    Date: 41858
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 4, 2014

    Western Sector Treatment System Soil Vapor Extraction Wells
    CX(s) Applied: B3.1
    Date: 41855
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 4, 2014

    Western Sector Treatment System Soil Vapor Extraction Wells
    CX(s) Applied: B3.1
    Date: 41855
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 1, 2014

    Subcontractor Will Provide Roof Repairs at 225-9H
    CX(s) Applied: B1.3
    Date: 41852
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 1, 2014

    Floor Repair in Select Reactor Offices and Admin. Trailer 704-27L
    CX(s) Applied: B1.3, B1.16
    Date: 41852
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 1, 2014

    Spray Herbicide on 105-P & 105-R Roofs
    CX(s) Applied: B1.3
    Date: 41852
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 1, 2014

    Floor Repair in Select Reactor Offices and Admin. Trailer 704-27L
    CX(s) Applied: B1.3, B1.16
    Date: 41852
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • August 1, 2014

    Spray Herbicide on 105-P & 105-R Roofs
    CX(s) Applied: B1.3
    Date: 41852
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 30, 2014

    Actinide Removal and Extraction-Scrub-Strip (ESS) Testing for Modular Caustic-side Solvent Extraction (MCU) Support (SB8)
    CX(s) Applied: B3.6
    Date: 41850
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 28, 2014

    Corrosion Testing in Support of Alternative Chemical Cleaning for Sludge Heel Removal
    CX(s) Applied: B3.6
    Date: 41879
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 28, 2014

    Subcontractor Will Provide Roof Repairs at 702-K
    CX(s) Applied: B1.3
    Date: 41848
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 24, 2014

    Demolition of Outfall Sampling Station
    CX(s) Applied: B1.23
    Date: 41844
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 24, 2014

    Tritium Responsive Infrastructure Modifications
    CX(s) Applied: B1.15
    Date: 41844
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 21, 2014

    Biofuels Production Experiment
    CX(s) Applied: B3.6
    Date: 41841
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 21, 2014

    782-A A-Area Service and Fire Water Storage Tank Coating Repairs
    CX(s) Applied: B1.3
    Date: 41841
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office