You are here

Categorical Exclusion Determinations: Savannah River Operations Office

Categorical Exclusion Determinations issued by Savannah River Operations Office.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • November 20, 2014

    245-16F Restroom: Major Repairs
    CX(s) Applied: B1.3
    Date: 11/20/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 26, 2013

    Digestion analysis of copper foil and silicon carbide samples
    CX(s) Applied: B3.6
    Date: 11/26/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 21, 2013

    Subcontractor Repair of Roof Leaks at 238-H
    CX(s) Applied: B1.3
    Date: 11/21/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 21, 2013

    Process Science Analytical Laboratory (PSAL)
    CX(s) Applied: B3.6
    Date: 11/21/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 21, 2013

    701-13G Wackenhut Services, Inc. (WSI) Repair of the Septic Tank Drain Field at Barricade 6
    CX(s) Applied: B1.3
    Date: 11/21/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 20, 2013

    Technetium Removal Laboratory Directed Research & Development (LDRD) Research with an Alkaline Simulant
    CX(s) Applied: B3.6
    Date: 11/20/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 13, 2013

    Long-term In-situ Monitoring for Subsurface Contaminant Stability
    CX(s) Applied: B3.6
    Date: 11/13/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 12, 2013

    Subcontractor Repair of Roof Leaks at 724-36E
    CX(s) Applied: B1.3
    Date: 11/12/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 12, 2013

    Subcontractor Repair of Roof Leaks at 248-H
    CX(s) Applied: B1.3
    Date: 11/12/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 12, 2013

    Savannah River National Laboratory (SRNL) Building 735-13A Heating, Ventilation and Air-Conditioning (HVAC) System Addition
    CX(s) Applied: B1.3
    Date: 11/12/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 7, 2013

    Subcontractor Repair of Roof Leaks at 704-L
    CX(s) Applied: B1.3
    Date: 11/07/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 7, 2013

    Obtain soil samples for potential D-Area borrow sources
    CX(s) Applied: B6.1
    Date: 11/07/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 6, 2013

    Subcontractor Repair of Roof Leaks at 731-2N
    CX(s) Applied: B1.3
    Date: 11/06/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 6, 2013

    Subcontractor Repair of Roof Leaks at 731-4N
    CX(s) Applied: B1.3
    Date: 11/06/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 6, 2013

    Subcontractor Repair of Roof Leaks at 731-3N
    CX(s) Applied: B1.3
    Date: 11/06/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 6, 2013

    Bioprocessing for Bioremediation and Energy Production
    CX(s) Applied: B3.6
    Date: 11/06/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 26, 2013

    Subcontractor Repair of Roof Leaks at 720-H
    CX(s) Applied: B1.3
    Date: 09/26/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 26, 2013

    Subcontractor Repair of Roof Leaks at 717-1N
    CX(s) Applied: B1.3
    Date: 09/26/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 25, 2013

    Subcontractor Repair of Roof Leaks at 735-2B
    CX(s) Applied: B1.3
    Date: 09/25/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 25, 2013

    735-11A Lab Module 115 Microscopy and Spectroscopy Experiments
    CX(s) Applied: B3.6
    Date: 09/25/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 25, 2013

    Contained Scanning Electron Microscope, C-134/138, Building 773-A
    CX(s) Applied: B3.6
    Date: 09/25/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 23, 2013

    Subcontractor Repair of Roof Leaks at 704-45H
    CX(s) Applied: B1.3
    Date: 09/23/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 23, 2013

    Subcontractor Repair of Roof Leaks at 705-H
    CX(s) Applied: B1.3
    Date: 09/23/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 23, 2013

    Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142
    CX(s) Applied: B3.6
    Date: 09/23/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 19, 2013

    Installation of Manway to H-Canyon Exhaust Tunnel
    CX(s) Applied: B2.5
    Date: 09/19/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office