  • May 26, 2016

    Community-scale PV System Installation
    Award Number: DE-EE0006952
    CX(s) Applied: A9, B5.16
    Office of Indian Energy
    Date: 05/26/2016
    Location(s): ND
    Office(s): Golden Field Office

  • March 14, 2016

    Prairie Sun Community Solar Garden
    Award Number: DE-EE0006216
    CX(s) Applied: B5.16
    Weatherization and Intergovernmental Program
    Date: 03/14/2016
    Location(s): ND
    Office(s): Golden Field Office

  • December 22, 2015

    Investigation of Rare Earth Element Extraction from North Dakota Coal-Related Feedstocks
    CX(s) Applied: A11, B3.1, B3.6
    Date: 12/22/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • December 10, 2015

    RESEARCH AND DEVELOPMENT OF INNOVATIVE TECHNOLOGIES FOR LOW IMPACT HYDROPOWER DEVELOPMENT
    Award Number: DE-EE0007246
    CX(s) Applied: A9, B3.6
    Water Power Technologies Office
    Date: 12/10/2015
    Location(s): ND
    Office(s): Golden Field Office

  • September 4, 2015

    Development of Intelligent Monitoring System (IMS) Modules for the Aquistore Carbon Dioxide
    CX(s) Applied: A9
    Date: 09/04/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • August 25, 2015

    Subtask 2.1 – Pathway to Low-Carbon Lignite Utilization
    CX(s) Applied: A9, B3.6
    Date: 08/25/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • July 30, 2015

    Subtask 4.1 - Strategic Studies
    CX(s) Applied: A9, A11, B3.1
    Date: 07/30/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • July 28, 2015

    Demonstration of Flare Gas to Electric Power Using Organic Ranking Cycle Generation
    CX(s) Applied: B3.6
    Date: 07/28/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • July 22, 2015

    Developing and Validating Pressure Management and Plume Control Strategies in the Williston Basin through a Brine Extraction and Storage Test
    CX(s) Applied: A9, B3.6, B4.6
    Date: 07/22/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • July 22, 2015

    Task 6 - Management and Reporting
    CX(s) Applied: A1, A9, A11
    Date: 07/22/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • July 21, 2015

    Interfacing MFIX with PETSc and HYPRE Linear Solver Libraries
    CX(s) Applied: A9
    Date: 07/21/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • July 15, 2015

    Fullerton Tap
    CX(s) Applied: B4.11
    Date: 07/15/2015
    Location(s): North Dakota
    Offices(s): Western Area Power Administration-Upper Great Plains Region

  • June 8, 2015

    Towner Switchyard Construction
    CX(s) Applied: B4.11
    Date: 06/08/2015
    Location(s): North Dakota
    Offices(s): Western Area Power Administration-Upper Great Plains Region

  • April 7, 2015

    EERC–DOE Joint Program on Research and Development for Fossil Energy-Related Resources
    CX(s) Applied: A1, A9, A11
    Date: 04/07/2015
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • May 8, 2014

    Subtask 2.20: EERC Evaluation of Tight Oil Formations
    CX(s) Applied: A9, B3.6
    Date: 05/08/2014
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • April 9, 2014

    Subtask 2.20: Energy and Environmental Research Center Evaluation of Tight Oil Formations
    CX(s) Applied: A9, B3.6
    Date: 04/09/2014
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • January 29, 2014

    Subtask 2.19 - Operational Flexibility of Carbon Dioxide Transport and Storage
    CX(s) Applied: A9
    Date: 01/29/2014
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • November 19, 2013

    Edgeley Substation
    CX(s) Applied: B4.6
    Date: 11/19/2013
    Location(s): North Dakota
    Offices(s): Western Area Power Administration-Upper Great Plains Region

  • October 1, 2013

    Evaluation of Deep Subsurface Resistivity Imaging for Hydrofracture Monitoring
    CX(s) Applied: A9, A11, B3.1, B3.6
    Date: 10/01/2013
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • September 26, 2013

    Ion Advanced Solvent Carbon Dioxide Capture Pilot Project
    CX(s) Applied: A9, A11
    Date: 09/26/2013
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • September 11, 2013

    Scalable, Automated, Semi permanent Seismic Method for Detecting Carbon Dioxide Plume Extent During Geological…
    CX(s) Applied: A9
    Date: 09/11/2013
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • September 10, 2013

    Dry Solids Pump Coal Feed Technology Program
    CX(s) Applied: B3.6
    Date: 09/10/2013
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • August 27, 2013

    Advancing Carbon Dioxide Capture Technology: Partnership for Carbon Dioxide Capture Phase III
    CX(s) Applied: B3.6
    Date: 08/27/2013
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • August 12, 2013

    Subtask 3.12: Gasification, Warm-Gas Cleanup, and Liquid Fuels Production with Illinois Coal
    CX(s) Applied: B3.6
    Date: 08/12/2013
    Location(s): North Dakota
    Offices(s): National Energy Technology Laboratory

  • July 23, 2013

    Thermally Efficient and Protective Cooling Technologies for Advanced Gas Turbines
    CX(s) Applied: B3.6
    Date: 07/23/2013
    Location(s): North Dakota