You are here

Categorical Exclusion Determinations: National Energy Technology Laboratory

Categorical Exclusion Determinations issued by National Energy Technology Laboratory.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • June 8, 2016

    Novel Carbon Dioxide-Selective Membranes for Carbon Dioxide Capture from

  • June 8, 2016

    Rare Earth Metals Extraction (REME)
    CX(s) Applied: A9, B3.6
    Date: 01/22/2016
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • June 8, 2016

    Improved Reliability of Solid Oxide Fuel Cell Systems – LG Fuel Cell Systems
    CX(s) Applied: B3.6
    Date: 01/21/2016
    Location(s): Washington
    Offices(s): National Energy Technology Laboratory

  • March 11, 2016

    Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Incidents, and Literature
    CX(s) Applied: A9
    Date: 03/11/2016
    Location(s): Multiple Locations
    Offices(s): National Energy Technology Laboratory

  • March 11, 2016

    Subsea Produced Water Sensor Development (Project Modifications)
    CX(s) Applied: A9, A11, B3.6
    Date: 03/11/2016
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • March 11, 2016

    Subsea Produced Water Sensor Development (Addition of Sub-Recipient)
    CX(s) Applied: A9, A11, B3.6
    Date: 03/11/2016
    Location(s): Other
    Offices(s): National Energy Technology Laboratory

  • March 9, 2016

    Dry Solids Pump Coal Feed Technology Program
    CX(s) Applied: A9, A11, B3.6
    Date: 03/09/2016
    Location(s): Multiple Locations
    Offices(s): National Energy Technology Laboratory

  • March 8, 2016

    Affordable Rankine Cycle Waste Heat Recovery for Heavy Duty Trucks
    CX(s) Applied: B3.6
    Date: 03/08/2016
    Location(s): Wisconsin
    Offices(s): National Energy Technology Laboratory

  • March 8, 2016

    University Coalition for Fossil Energy Research
    CX(s) Applied: A9
    Date: 03/08/2016
    Location(s): Multiple Locations
    Offices(s): National Energy Technology Laboratory

  • March 7, 2016

    Increasing Nationwide ZEV Adoption – Enhanced Joint Procurement Process
    CX(s) Applied: A9, A11
    Date: 03/07/2016
    Location(s): Multiple Locations
    Offices(s): National Energy Technology Laboratory

  • March 3, 2016

    Aggregated Alternative Technology Alliance (AATA)
    CX(s) Applied: A1, A9
    Date: 03/03/2016
    Location(s): Multiple Locations
    Offices(s): National Energy Technology Laboratory

  • March 3, 2016

    Combined PV/Battery Grid Integration with High Frequency Magnetics Enabled Power
    CX(s) Applied: B5.15
    Date: 03/03/2016
    Location(s): Wisconsin
    Offices(s): National Energy Technology Laboratory

  • March 3, 2016

    Combined PV/Battery Grid Integration with High Frequency Magnetics Enabled Power Electronics
    CX(s) Applied: B5.15
    Date: 03/03/2016
    Location(s): Ohio
    Offices(s): National Energy Technology Laboratory

  • March 2, 2016

    Combined PV/Battery Grid Integration with High Frequency Magnetics Enabled Power
    CX(s) Applied: B5.15
    Date: 03/02/2016
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • March 2, 2016

    Project Close-Out: Transfer of Real Estate Interests to DOE
    CX(s) Applied: A1
    Date: 03/02/2016
    Location(s): Illinois
    Offices(s): National Energy Technology Laboratory

  • February 29, 2016

    Low-Pressure Development Combustor
    CX(s) Applied: B3.6
    Date: 02/29/2016
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • February 19, 2016

    Update and Enhancement of Shale Gas Outlooks
    CX(s) Applied: B3.6
    Date: 02/19/2016
    Location(s): Texas
    Offices(s): National Energy Technology Laboratory

  • February 19, 2016

    Subsea High Voltage Direct Current Connectors for Environmentally Safe and Reliable Powering of UDW Subsea Processing
    CX(s) Applied: A9, A11, B3.6
    Date: 02/19/2016
    Location(s): New York
    Offices(s): National Energy Technology Laboratory

  • February 18, 2016

    More Improvements to Deepwater Subsea Measurement
    CX(s) Applied: A9, B3.6
    Date: 02/18/2016
    Location(s): New York
    Offices(s): National Energy Technology Laboratory

  • February 16, 2016

    Support for the NETL's Waste Treatment and Immobilization Plant Project
    CX(s) Applied: A1, A9
    Date: 02/16/2016
    Location(s): Other
    Offices(s): National Energy Technology Laboratory

  • February 11, 2016

    Development and Validation of Predictive Models for In-Cylinder Radiation and Wall Heat Transfer
    CX(s) Applied: A9
    Date: 02/11/2016
    Location(s): California
    Offices(s): National Energy Technology Laboratory

  • February 1, 2016

    Addition of a Class 3B Laser to the High Pressure Water Tunnel Project
    CX(s) Applied: B3.6
    Date: 02/01/2016
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • January 25, 2016

    Architectural and Engineering Designs
    CX(s) Applied: A11
    Date: 01/25/2016
    Location(s): Multiple Locations
    Offices(s): National Energy Technology Laboratory

  • January 22, 2016

    High BMEP and High Efficiency Micro-Pilot Ignition Natural Gas Engine
    CX(s) Applied: A9, B3.6
    Date: 01/22/2016
    Location(s): Michigan
    Offices(s): National Energy Technology Laboratory

  • January 22, 2016

    Reducing the Impacts of Gas Shale Development: Advanced Analytical Methods for Air and Stray Gas Emissions and Produced Brine Characterization
    CX(s) Applied: A9, B3.1
    Date: 01/22/2016
    Location(s): Kentucky
    Offices(s): National Energy Technology Laboratory