  • December 1, 2014

    Development and Implementation of an Automatic Continuous Online Monitoring and Control Platform for Polymerization Reactions to Sharply Boost Energy and Resource Efficiency in Polymer Manufacturing
    Award Number: DE-EE0006270
    CX(s) Applied: B3.6
    Date: 12/1 /2014
    Location(s): LA
    Office(s): Golden Field Office

  • June 9, 2014

    Replace West Hackberry Ported Coax at Northwest Perimeter (WH-OM-1194)
    CX(s) Applied: B1.7
    Date: 06/09/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 27, 2014

    Purchase of West Hackberry Gate Valve Replacement Parts
    CX(s) Applied: B1.3
    Date: 05/27/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • May 19, 2014

    Site Wide Card Access System Hardware and Software Upgrade
    CX(s) Applied: B1.7
    Date: 05/19/2014
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • April 24, 2014

    Rework West Hackberry 36” Crude Oil Pipeline Mainline Valves
    CX(s) Applied: B1.3
    Date: 12/10/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 30, 2014

    Double Outriggers for Bayou Choctaw North Fence
    CX(s) Applied: B1.11
    Date: 01/30/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 27, 2014

    Replace Bayou Choctaw 16” B-Spec Crude Oil Header Piping
    CX(s) Applied: B1.3
    Date: 01/27/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 10, 2014

    Strategic Petroleum Reserve Leased Workover Rig and Workover Services, 2014-2018
    CX(s) Applied: B5.12
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • January 10, 2014

    Bayou Choctaw Cavern 20 Decommissioning (Long Term Actions)
    CX(s) Applied: B1.28
    Date: 01/10/2014
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • December 10, 2013

    Demolish State Police Radio Tower at West Hackberry
    CX(s) Applied: B1.19
    Date: 12/10/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • October 15, 2013

    West Hackberry RWIS Recycle Valve Upgrade
    CX(s) Applied: B1.3
    Date: 10/15/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 17, 2013

    Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters Government Furnished Equipment
    CX(s) Applied: B5.2
    Date: 09/17/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 11, 2013

    Distributed Fiber Optic Arrays: Integrated Temperature and Seismic Sensing for Detection of Carbon Dioxide Flow..
    CX(s) Applied: B3.6, B3.11
    Date: 09/11/2013
    Location(s): Louisiana
    Offices(s): National Energy Technology Laboratory

  • September 9, 2013

    Blast and Paint West Hackberry Meter Skid, Prover Piping and Structure
    CX(s) Applied: B1.3
    Date: 09/09/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • September 5, 2013

    State Energy Program- Ivan Smith Furniture 2 - Compressed Natural Gas Vehicle Fueling Stations
    CX(s) Applied: B5.1, B5.22
    Date: 09/05/2013
    Location(s): Louisiana
    Offices(s): Golden Field Office

  • August 22, 2013

    Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines
    CX(s) Applied: B1.3
    Date: 08/22/2013
    Location(s): Texas, Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • August 19, 2013

    Clean and Inspect West Hackberry T-15 Brine Tank
    CX(s) Applied: B1.3
    Date: 08/19/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 23, 2013

    Thermally Efficient and Protective Cooling Technologies for Advanced Gas Turbines
    CX(s) Applied: B3.6
    Date: 07/23/2013
    Location(s): Louisiana
    Offices(s): National Energy Technology Laboratory

  • July 11, 2013

    Strategic Petroleum Reserve Computer Services, 2015-2020
    CX(s) Applied: B1.7
    Date: 07/11/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 9, 2013

    Replace Bayou Choctaw 500 KVA Power Transformer
    CX(s) Applied: B1.3
    Date: 07/09/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • July 3, 2013

    Replace West Hackberry Brine Disposal System Header from MOV-51’s to WHT-14/15 Brine Tanks with HDPE Pipe
    CX(s) Applied: B5.2
    Date: 07/03/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 24, 2013

    Replace Obsolete West Hackberry Raw Water Injection Pump Vibration Transmitters
    CX(s) Applied: B5.2
    Date: 06/24/2013
    Location(s): Louisiana
    Offices(s): Strategic Petroleum Reserve Field Office

  • June 3, 2013

    An Integrated Study on a Novel High Temperature High Entropy Alloy
    CX(s) Applied: B3.6
    Date: 06/03/2013
    Location(s): Louisiana
    Offices(s): National Energy Technology Laboratory

  • June 3, 2013

    An Integrated Study on a Novel High Temperature High Entropy Alloy
    CX(s) Applied: B3.6
    Date: 06/03/2013
    Location(s): Louisiana
    Offices(s): National Energy Technology Laboratory

  • April 23, 2013

    Hydrogen Peroxide Treatment of Strategic Petroleum Reserve Heat Exchangers BOA
    CX(s) Applied: B1.3
    Date: 04/23/2013
    Location(s): Louisiana