DOCUMENTS AVAILABLE FOR DOWNLOAD

  • October 13, 2011

    Design and Install a Modification to the HB-Line Exhaust Fan Dampers
    CX(s) Applied: B2.5
    Date: 10/13/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management

  • October 13, 2011

    Install Drain Sink in Room 141, Building 735-11A
    CX(s) Applied: B3.6
    Date: 10/13/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • October 12, 2011

    H1616 O-Ring Aging Studies
    CX(s) Applied: B3.6
    Date: 10/12/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • October 12, 2011

    Printed Circuit Board Through-Hole Plating, Masking, and Legending Process
    CX(s) Applied: B3.6
    Date: 10/12/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • October 11, 2011

    Installation of the F Pump Tank 1 (FPT-1) Dip Tube Jumpers to Clear Plug
    CX(s) Applied: B1.3
    Date: 10/11/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • October 11, 2011

    Replace Pole 178 and 13.8 Kilovolt Disconnect Switch in H-Area
    CX(s) Applied: B1.3
    Date: 10/11/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • October 10, 2011

    Flushing of the Ellenton Header & R-Normal River Water Lines
    CX(s) Applied: B1.3
    Date: 10/10/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • October 4, 2011

    Replace the S1#2 Fan at 235-F
    CX(s) Applied: B1.3
    Date: 10/04/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • October 4, 2011

    Federal Bureau of Investigation Radiological Dispersion Device Training
    CX(s) Applied: B1.2
    Date: 10/04/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • October 3, 2011

    Remove Insulation from High Point Flush Pump Drain Valve
    CX(s) Applied: B1.3
    Date: 10/03/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 29, 2011

    Operation of Accredited Industrial Hygiene (IH) Laboratory in Building 772-F, Revision 1
    CX(s) Applied: B3.6
    Date: 09/29/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 28, 2011

    Repair Radiological Fixative Coatings in F Tank Farm
    CX(s) Applied: B1.3
    Date: 09/28/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Sandia Site Office

  • September 28, 2011

    Install Two New Steam Line Poles to Replace Poles # K164 and K165 in 105-K Area
    CX(s) Applied: B1.3
    Date: 09/28/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Sandia Site Office

  • September 28, 2011

    Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-A
    CX(s) Applied: B2.1
    Date: 09/28/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Savannah River Operations Office

  • September 22, 2011

    Installation of Traffic Signals on C-Road for the Biomass Cogeneration Facility Access Road
    CX(s) Applied: B1.32
    Date: 09/22/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 21, 2011

    Excavation And Installation of a Pad to Anchor Conduit for a 480-Volt Line to Supply Heat to the F-Canyon Truckwell
    CX(s) Applied: B2.1
    Date: 09/21/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Sandia Site Office

  • September 16, 2011

    Provide Design to Install a Seismic Switch to Shut Down Both Supply Fans and Both Room Exhaust Fans During a Seismic Event
    CX(s) Applied: B2.5
    Date: 09/16/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 16, 2011

    285-H Cooling Tower Basin Well Water Makeup Supply Bypass
    CX(s) Applied: B1.5
    Date: 09/16/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 14, 2011

    Sampling Cooling Tower Water at Savannah River Site and Performing and Analysis for Legionella Pneumophila Density
    CX(s) Applied: B3.1
    Date: 09/14/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 14, 2011

    Reconfigure and Standardize Piping to Floor Drain in Pump Pit 281-9H
    CX(s) Applied: B1.3
    Date: 09/14/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 14, 2011

    Replace Wooden Poles Around K Area
    CX(s) Applied: B1.3
    Date: 09/14/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 13, 2011

    Disposition of Shacks and Handihouse Staged in Area Laydown
    CX(s) Applied: B1.23
    Date: 09/13/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 13, 2011

    Synthesis and Characterization of Coatings by Chemical Solution Deposition Methods
    CX(s) Applied: B3.6
    Date: 09/13/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 12, 2011

    3-160th Special Operations Aviation Regiment (SOAR) Training
    CX(s) Applied: B1.2
    Date: 09/12/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, National Energy Technology Laboratory

  • September 12, 2011

    Install Fencing South of the Receiving Basin for Off-site Fuels (RBOF) to the East Side of 707-H
    CX(s) Applied: B1.11
    Date: 09/12/2011
    Location(s): Aiken, South Carolina
    Office(s): Environmental Management, Sandia Site Office