Categorical Exclusion Determinations: Colorado

Location

Categorical Exclusion Determinations issued for actions in Colorado.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • October 21, 2014

    Laufer Wind Group NWTC Structure Lighting Tests; NREL Tracking No. 13-014
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: A9, B1.31, B5.15, B3.3
    Date: 10/21/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • October 8, 2014

    Recovery Act: Direct Confirmation of Commercial Geothermal Resources in Colorado using Remote Sensing and On-Site Exploration, Testing and Analysis
    Award Number: DE-EE0002828
    CX(s) Applied: A9, B3.1
    Date: 10/08/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • October 7, 2014

    NWTC-University of Colorado Unmanned Aerial Systems Wind Turbine Wakes and Radar Tracking Demonstration NREL Tracking No. 14-024
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: A9, A11, B3.2, B3.6
    National Renewable Energy Laboratory
    Date: 10/07/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • October 2, 2014

    Solar Decathlon 2015 โ€“ NREL Tracking No. 14-017
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: A9, A11, B5.1
    National Renewable Energy Laboratory
    Date: 10/02/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • October 2, 2014

    STM Field Testing Laboratory Building Exterior Upgrade โ€“ NREL Tracking No. 14-022
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: DOE/EA 1440
    National Renewable Energy Laboratory
    Date: 10/02/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • October 2, 2014

    STM Parking Structure Stairway Restoration โ€“ NREL Tracking No. 14-023
    Award Number: DE-AC36-08GO28308
    CX(s) Applied: DOE/EA 1440
    National Renewable Energy Laboratory
    Date: 10/02/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • September 30, 2014

    NWTC Strategic Aerospace Unmanned Aerial System Wind Turbine Inspection Demonstration NREL Tracking No 14-021
    CX(s) Applied: A9, A11, B3.2, B3.6
    National Renewable Energy Laboratory
    Date: 09/30/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • August 28, 2014

    Development of an Abrasion-Resistant Antisoiling Coating for Front-Surface Reflectors
    Award Number: DE-EE0006696
    CX(s) Applied: A9, B3.6, B3.15
    Solar Energy Technologies
    Date: 08/28/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • August 27, 2014

    National Community Solar Platform
    Award Number: DE-EE0006681
    CX(s) Applied: A9, A11
    Solar Energy Technologies
    Date: 08/27/2014
    Location(s): Colorado
    Office(s): Golden Field Office

  • July 2, 2014

    Danger Tree Management on Curecanti to Poncha 230-kilovolt Transmission Line, Gunnison County, Colorado
    CX(s) Applied: B1.3
    Date: 07/02/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • July 2, 2014

    Reconciling Unconventional Gas Emission Estimates (SUMMARY)
    CX(s) Applied: A1, A9, A11, B3.1
    Date: 07/02/2014
    Location(s): Colorado, California
    Offices(s): National Energy Technology Laboratory

  • July 1, 2014

    Danger Tree Management on Gore Pass-Kremmling 138-kilovolt Transmission Line (Amended), Grand County, Colorado
    CX(s) Applied: B1.3
    Date: 07/01/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • June 25, 2014

    Quantitative Characterization of Impacts of Couple Geomechanics and Flow - Lab Experiments/Modeling
    CX(s) Applied: B3.6
    Date: 06/25/2014
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • June 23, 2014

    Danger Tree Management on Green Mountain-Blue Ridge Repeater 2.4-kilovolt Distribution Line (Amended), Grand County, Colorado
    CX(s) Applied: B1.3
    Date: 06/23/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • June 17, 2014

    FRAPPE and DISCOVER-AQ Experiments
    CX(s) Applied: A9, A11, B3.1
    Date: 06/17/2014
    Location(s): Colorado
    Offices(s): Golden Field Office

  • June 14, 2014

    Carbon Absorber Retrofit Equipment (CARE) - Site Relocation
    CX(s) Applied: B3.6
    Date: 06/23/2014
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • June 12, 2014

    Evaluation of Deep Subsurface Resistivity Imaging for Hydrofracture Monitoring
    CX(s) Applied: B3.1, B3.6
    Date: 06/12/2014
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • June 10, 2014

    Recovery Act: Direct Confirmation of Commercial Geothermal Resources in Colorado using Remote Sensing and On-Site Exploration, Testing and Analysis
    CX(s) Applied: A9, B3.1
    Date: 06/10/2014
    Location(s): Colorado
    Offices(s): Golden Field Office

  • June 3, 2014

    Collbran Substation Conduit Installation and Breaker Replacement, Mesa County, Colorado
    CX(s) Applied: B4.6
    Date: 06/03/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • June 2, 2014

    Danger Tree Management on Gore Pass-Hayden 138-kilovolt Transmission Line, Grand and Routt Counties, Colorado
    CX(s) Applied: B1.3
    Date: 06/02/2014
    Location(s): Colorado, Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • June 2, 2014

    Danger Tree Management on Craig-Rifle 230-kilovolt Transmission Line, Moffat, Rio Blanco, and Garfield Counties, Colorado
    CX(s) Applied: B1.3
    Date: 06/02/2014
    Location(s): Colorado, Colorado, Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • June 2, 2014

    Danger Tree Management on Blue River-Gore Pass 230-kilovolt Transmission Line (Amended), Grand County, Colorado
    CX(s) Applied: B1.3
    Date: 06/02/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 20, 2014

    NREL National Wind Technology Center Offsite 115 Kilovolt Tramsmission Line - Planning, Preliminary Design, and Environmental Surveys
    CX(s) Applied: A9, B3.1
    Date: 05/20/2014
    Location(s): Colorado
    Offices(s): Golden Field Office

  • May 20, 2014

    NREL National Wind Technology Center Offsite 115 Kilovolt Tramsmission Line - Planning, Preliminary Design, and Environmental Surveys
    CX(s) Applied: A9, B3.1
    Date: 05/20/2014
    Location(s): Colorado
    Offices(s): Golden Field Office

  • May 19, 2014

    Deering Lake-Eckley 115 Kilovolt Transmission Line Structure Replacements, Yuma County, Colorado
    CX(s) Applied: B1.3
    Date: 05/19/2014
    Location(s): Colorado
    Offices(s): Western Area Power Administration-Rocky Mountain Region