Categorical Exclusion Determinations: B5.5

Existing Regulations

B5.5: Short pipeline segments
Construction and subsequent operation of short (generally less than 20 miles in length) pipeline segments conveying materials (such as air, brine, carbon dioxide, geothermal system fluids, hydrogen gas, natural gas, nitrogen gas, oil, produced water, steam, and water) between existing source facilities and existing receiving facilities (such as facilities for use, reuse, transportation, storage, and refining), provided that the pipeline segments are within previously disturbed or developed rights-of-way.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • September 9, 2013

    Injecting Carbon Dioxide into Unconventional Storage Reservoirs in the Central Appalachian Basin...
    CX(s) Applied: B3.1, B5.3, B5.5, B5.13
    Date: 09/09/2013
    Location(s): Tennessee
    Offices(s): National Energy Technology Laboratory

  • September 9, 2013

    Small-Scale Enhanced Coalbed Methane Test
    CX(s) Applied: B3.1, B5.3, B5.5, B5.13
    Date: 09/09/2013
    Location(s): Virginia
    Offices(s): National Energy Technology Laboratory

  • July 26, 2013

    Optimization Project #3
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 07/26/2013
    Location(s): Wyoming
    Offices(s): RMOTC

  • July 26, 2013

    Optimization Project Area #1
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 07/26/2013
    Location(s): Wyoming
    Offices(s): RMOTC

  • June 28, 2013

    Optimization Project Area #2
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 06/28/2013
    Location(s): Wyoming
    Offices(s): RMOTC

  • March 13, 2013

    Easts Ide Renovation Project Zone 1-Revision (T-1-11)
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 03/13/2014
    Location(s): Wyoming
    Offices(s): RMOTC

  • March 13, 2013

    Easts Ide Renovation Project Zone 1-Revision (T-1-11)
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 03/13/2014
    Location(s): Wyoming
    Offices(s): RMOTC

  • December 13, 2012

    Sologen Geothermal Co-Production Field Demonstration
    CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15
    Date: 12/13/2012
    Location(s): Texas
    Offices(s): Golden Field Office

  • July 2, 2012

    State Energy Plan Council School District Woody Biomass Project
    CX(s) Applied: B5.1, B5.5
    Date: 07/02/2012
    Location(s): Idaho
    Offices(s): Golden Field Office

  • June 13, 2012

    Utility Corridor Extension
    CX(s) Applied: B4.7, B4.11, B5.2, B5.5
    Date: 06/13/2012
    Location(s): Pennsylvania
    Offices(s): Naval Nuclear Propulsion Program, Bettis Site

  • March 13, 2012

    Install Extension of the Underground Natural Gas Line From Its Current Termination Point
    CX(s) Applied: B5.5
    Date: 03/13/2012
    Location(s): New York
    Offices(s): Brookhaven Site Office

  • January 13, 2012

    Waste Management Milam High British Thermal Units Project
    CX(s) Applied: B5.21, B5.5
    Date: 01/13/2012
    Location(s): Illinois
    Offices(s): Golden Field Office

  • August 20, 2010

    Clean Energy Development Fund - Renewable Energy Program - State Office Building and District Court
    CX(s) Applied: A9, B1.24, B1.27, B2.2, B2.5, B5.1, B5.5
    Date: 08/20/2010
    Location(s): Bennington, Vermont
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • July 1, 2010

    Oregon Energy Efficiency and Conservation Block Grant Formula - City of Cove
    CX(s) Applied: B5.4, B5.5
    Date: 07/01/2010
    Location(s): Cove, Oregon
    Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

  • March 24, 2010

    Pennsylvania - Economic Development Authority Sustainable Business Recovery - Chrin Brothers
    CX(s) Applied: B1.15, B1.24, B5.1, B5.5
    Date: 03/24/2010
    Location(s): Easton, Pennsylvania
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

  • December 2, 2009

    West Virginia Revision 1 - Energy Efficiency in State Buildings: Corrections - Project 1 Huttonsville Correctional Center
    CX(s) Applied: B1.31, B2.5, B5.1, B5.4, B5.5
    Date: 12/02/2009
    Location(s): Huttonsville, West Virginia
    Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory