Wind Turbine Installation for Town of Drummond
CX(s) Applied: B5.18
Date: 12/19/2012
Location(s): Oklahoma
Offices(s): Golden Field Office
Existing Regulations
B5.18: Wind turbines
The installation, modification, operation, and removal of a small number (generally not more than 2) of commercially available wind turbines, with a total height generally less than 200 feet (measured from the ground to the maximum height of blade rotation) that (1) are located within a previously disturbed or developed area; (2) are located more than 10 nautical miles (about 11.5 miles) from an airport or aviation navigation aid; (3) are located more than 1.5 nautical miles (about 1.7 miles) from National Weather Service or Federal Aviation Administration Doppler weather radar; (4) would not have the potential to cause significant impacts on bird or bat populations; and (5) are sited or designed such that the project would not have the potential to cause significant impacts to persons (such as from shadow flicker and other visual effects, and noise). Covered actions would be in accordance with applicable requirements (such as local land use and zoning requirements) in the proposed project area and would incorporate appropriate control technologies and best management practices. Covered actions include only those related to wind turbines to be installed on land.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
December 19, 2012
-
December 12, 2012
Loan Loss Reserve
CX(s) Applied: A9, A11, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19
Date: 12/12/2012
Location(s): Hawaii
Offices(s): Golden Field Office -
November 5, 2012
Partial Validation of Coupled Models and Optimization of Materials for Offshore Wind Structures
CX(s) Applied: B3.3, B3.16, B5.18
Date: 11/05/2012
Location(s): Maine
Offices(s): Golden Field Office -
October 11, 2012
Town of Poughkeepsie NEPA Statement of Work
CX(s) Applied: A9, A11, B1.35, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19
Date: 10/11/2012
Location(s): New York
Offices(s): Golden Field Office -
August 31, 2012
Long Island Smart Energy Corridor - Farmingdale Wind Turbines
CX(s) Applied: B5.18
Date: 08/31/2012
Location(s): New York
Offices(s): National Energy Technology Laboratory -
August 13, 2012
Recovery Act State Energy Program Award for the State of Ohio - Revolving Loan Fund
CX(s) Applied: A9, A11, B1.31, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19
Date: 08/13/2012
Location(s): Ohio
Offices(s): Golden Field Office -
May 22, 2012
Wind Energy Installations- Wind Turbine Project (ASO-CX-293)
CX(s) Applied: B5.18
Date: 05/22/2012
Location(s): Illinois
Offices(s): Argonne Site Office -
March 27, 2012
Renewable Energy and Energy Efficiency Revolving Loan Program - Andreola Farms, Incorporated
CX(s) Applied: B5.18
Date: 03/27/2012
Location(s): Nevada
Offices(s): Golden Field Office -
January 23, 2012
Minnesota Chippewa Tribe (Mille Lacs Band)
CX(s) Applied: B3.6, B5.1. B5.16, B5.18
Date: 01/23/2012
Location(s): Minnesota
Offices(s): Energy Efficiency and Renewable Energy -
January 9, 2012
Kent County Nursing Home Wind Project
CX(s) Applied: B5.18
Date: 01/09/2012
Location(s): Texas
Offices(s): Golden Field Office -
December 20, 2011
Ralls Independent School District
CX(s) Applied: B5.18
Date: 12/20/2011
Location(s): Texas
Offices(s): Golden Field Office -
December 13, 2011
Nazareth Independent School District Wind Project
CX(s) Applied: B5.18
Date: 12/13/2011
Location(s): Texas
Offices(s): Golden Field Office -
December 13, 2011
City of Houston Wind Project
CX(s) Applied: B5.16, B5.18
Date: 12/13/2011
Location(s): Texas
Offices(s): Golden Field Office -
December 13, 2011
Highland Independent School District
CX(s) Applied: B5.18
Date: 12/13/2011
Location(s): Texas
Offices(s): Golden Field Office -
December 12, 2011
CEDF - Renewable Energy Program
CX(s) Applied: B5.18
Date: 12/12/2011
Location(s): Vermont
Offices(s): National Energy Technology Laboratory -
December 8, 2011
Texas A&M - Corpus Christi
CX(s) Applied: B5.18
Date: 12/08/2011
Location(s): Texas
Offices(s): Golden Field Office -
December 6, 2011
Energy Efficiency Retrofits and Renewable Energy Activity
CX(s) Applied: B5.1, B5.18
Date: 12/06/2011
Location(s): Nationwide
Offices(s): Energy Efficiency and Renewable Energy -
December 6, 2011
Energy Efficiency Retrofits and Renewable Energy Activity
CX(s) Applied: B5.1, B5.18
Date: 12/06/2011
Location(s): Texas
Offices(s): Energy Efficiency and Renewable Energy -
November 16, 2011
CATEGORICAL EXCLUSION (CX) FOR FINANCIAL INCENTIVE PROGRAMS (CX-EECBG-003)
CX(s) Applied: B5.1, B5.16, B5.17, B5.18, B5.20
Date: 11/16/2011
Location(s): Nationwide
Office(s): Energy Efficiency & Renewable Energy (EERE) / Oak Ridge Office (ORO) -
November 16, 2011
Renewable Energy Technologies on Government Buildings
CX(s) Applied: B5.1, B5.16, B5.17, B5.18, B5.20
Date: 11/16/2011
Location(s): Nationwide
Offices(s): Energy Efficiency and Renewable Energy