B4.8: Electricity transmission agreements
New electricity transmission agreements, and modifications to existing transmission arrangements, to use a transmission facility of one system to transfer power of and for another system, provided that no new generation projects would be involved and no physical changes in the transmission system would be made beyond the previously disturbed or developed facility area.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • December 19, 2012

    Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders
    CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8
    Date: 12/19/2012
    Location(s): Colorado
    Offices(s): National Energy Technology Laboratory

  • July 23, 2010

    Colonias for Microgrids (Texas) Electricity Delivery and Energy Reliability (OE) 14.09
    CX(s) Applied: A1, A9, B1.3, B2.3, B4.8, B5.1
    Date: 07/23/2010
    Location(s): Ranchitos Los Arcos, Texas
    Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

  • July 23, 2010

    Colonias for Microgrids (Texas) Electricity Delivery and Energy Reliability (OE) 14.09
    CX(s) Applied: A1, A9, B1.3, B2.3, B4.8, B5.1
    Date: 07/23/2010
    Location(s): Ranchitos Los Lomas, Texas
    Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

  • July 23, 2010

    Colonias for Microgrids (Texas) Electricity Delivery and Energy Reliability (OE) 14.09
    CX(s) Applied: A1, A9, B1.3, B2.3, B4.8, B5.1
    Date: 07/23/2010
    Location(s): Ranchitos Los Nopalitos, Texas
    Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory

  • June 9, 2010

    Bonneville Power Administration (BPA) and Puget Sound Energy, Inc. (PSE) Electricity Transmission Transfer Agreement
    CX(s) Applied: B4.8
    Date: 06/09/2010
    Location(s): Portland, Oregon
    Office(s): Bonneville Power Administration

  • June 9, 2010

    Transfer Agreement between Bonneville Power Administration and Puget Sound Energy, Incorporated
    CX(s) Applied: B4.8
    Date: 06/09/2010
    Location(s): Portland, Oregon