Sologen Geothermal Co-Production Field Demonstration
CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15
Date: 12/13/2012
Location(s): Texas
Offices(s): Golden Field Office
Existing Regulations
B4.12: Construction of powerlines
Construction of electric powerlines approximately 10 miles in length or less, or approximately 20 miles in length or less within previously disturbed or developed powerline or pipeline rights-of-way.
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
December 13, 2012
-
October 2, 2012
300 Area Electrical Service Project
CX(s) Applied: B4.12
Date: 10/02/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office -
June 8, 2012
Buried Power Line at Customer Operations Center
CX(s) Applied: B1.3, B4.6, B4.12
Date: 06/08/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 8, 2012
Buried Power Line at Customer Operations Center
CX(s) Applied: B1.3, B4.6, B4.12
Date: 06/08/2012
Location(s): Wyoming
Offices(s): RMOTC -
May 17, 2012
Buried Power Line to 64-SX-3
CX(s) Applied: B1.3, B4.6, B4.12
Date: 05/17/2012
Location(s): Wyoming
Offices(s): RMOTC -
October 7, 2011
Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project
CX(s) Applied: B4.12
Date: 10/07/2011
Location(s): Dayton, Columbia County, Washington
Office(s): Bonneville Power Administration -
May 24, 2011
Red Bluff Pumping Plant 6-kilovolt Interconnection Project
CX(s) Applied: B4.12
Date: 05/24/2011
Location(s): Tehama County, California
Office(s): Western Area Power Administration-Sierra Nevada Region -
April 8, 2011
Grandview, Arkansas Interconnection
CX(s) Applied: B4.12
Date: 04/08/2011
Location(s): Arkansas
Offices(s): Southwestern Power Administration -
March 11, 2011
Ohop Underbuild Project
CX(s) Applied: B4.6, B4.12
Date: 03/11/2011
Location(s): Pierce County, Washington
Office(s): Bonneville Power Administration -
February 4, 2011
B-TP-10 Buried Electrical Lines
CX(s) Applied: B1.3, B4.6, B4.7, B4.12
Date: 02/04/2011
Location(s): Casper, Wyoming
Office(s): RMOTC -
December 23, 2010
New Power Line for New Generator at Ten Sleep
CX(s) Applied: B1.3, B4.6, B4.10, B4.12, B5.1
Date: 12/23/2010
Location(s): Casper, Wyoming
Office(s): RMOTC -
September 3, 2010
Oklahoma - Tribe - Cherokee Nation, Oklahoma
CX(s) Applied: A1, A9, A11, B1.15, B2.5, B4.12, B5.1
Date: 09/03/2010
Location(s): Oklahoma
Office(s): Energy Efficiency and Renewable Energy -
August 23, 2010
Hadley Street Trail
CX(s) Applied: B1.10, B4.12
Date: 08/23/2010
Location(s): Haltom, Texas
Office(s): Energy Efficiency and Renewable Energy -
July 9, 2010
Geothermal Technologies Program
CX(s) Applied: B4.12
Date: 07/09/2010
Location(s): Casper, Wyoming
Office(s): RMOTC -
December 10, 2009
Native Village of Chitina Renewable Energy Technology - Solar Array for Community Hall
CX(s) Applied: B3.6, B5.1, B4.12
Date: 12/10/2009
Location(s): Chitina, Alaska
Office(s): Energy Efficiency and Renewable Energy -
November 20, 2009
Rewire Electrical to Pole at 77SHX10
CX(s) Applied: B1.3, B4.12
Date: 11/20/2009
Location(s): Casper, Wyoming
Office(s): RMOTC