Plans for 2D seismic survey; drill one stratigraphic well; perform detailed site characterization; perform numerical modeling to assess storage cap…
Updated Project Title to include Mobile Hot Cell (MHC).…
This revision deals with the addition of project scope to construct and test a mobile hot cell (MHC) to be used in the end-of-life management of ra…
The purpose of this revision is to add international scope for the Idaho National Laboratory (INL) Radiological Source Disposition Project funded b…
Categorical Exclusion Determination
Foreign Location Source Recovery- Fiscal Year 2014 CX(s) Applied: B2.6Date: 12/16/2014 Location(s): New MexicoOffices(s): Los Alamos Site Office
Foreign Location Source Recovery- Fiscal Year 2015 CX(s) Applied: B2.6Date: 12/02/2014 Location(s): New MexicoOffices(s): Los Alamos Site Office
Domestic Source Recovery- Fiscal Year 2015 CX(s) Applied: B2.6Date: 12/02/2014 Location(s): New MexicoOffices(s): Los Alamos Site Office
Facility Safety and Environmental Improvements CX(s) Applied: B2.6 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Domestic Source Recovery- Fiscal Year 2014 CX(s) Applied: B2.6Date: 12/16/2013 Location(s): New MexicoOffices(s): Los Alamos Site Office