Categorical Exclusion Determinations: B2.5

Existing Regulations

B2.5: Facility safety and environmental improvements
Safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/upgrade of control valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards and/or sustain high wind loading; and replacement of aboveground or belowground tanks and related piping, provided that there is no evidence of leakage, based on testing in accordance with applicable requirements (such as 40 CFR part 265, “Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities” and 40 CFR part 280, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks”). These actions do not include rebuilding or modifying substantial portions of a facility (such as replacing a reactor vessel).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 16, 2013

    B-4 Rooms 110, 111, and 112 Roof Top Heating, Ventilation, and Air Conditioning Unit Replacement
    CX(s) Applied: B1.4, B2.1, B2.2, B2.5
    Date: 04/16/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • April 16, 2013

    Site Arc Flash Electrical Upgrades
    CX(s) Applied: B1.3, B2.5
    Date: 04/16/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • April 10, 2013

    B903 Renovation
    CX(s) Applied: B1.16, B1.29, B2.1, B2.5
    Date: 04/10/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • April 1, 2013

    Alaska-TRIBE-ASSOCIATION OF VILLAGE COUNCIL PRESIDENTS, INC
    CX(s) Applied: B2.5, B5.1
    Date: 04/11/2013
    Location(s): Alaska
    Offices(s): Energy Efficiency and Renewable Energy

  • March 13, 2013

    Easts Ide Renovation Project Zone 1-Revision (T-1-11)
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 03/13/2014
    Location(s): Wyoming
    Offices(s): RMOTC

  • March 13, 2013

    Easts Ide Renovation Project Zone 1-Revision (T-1-11)
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 03/13/2014
    Location(s): Wyoming
    Offices(s): RMOTC

  • March 11, 2013

    Correct Obstruction in the Sprinkler System on Level 3 of HB-Line
    CX(s) Applied: B2.5
    Date: 03/11/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • March 7, 2013

    Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary
    CX(s) Applied: B2.5
    Date: 03/07/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 28, 2013

    Installing Vent/Drain on Inlet Headers of 292-H Recycle Vessel Vent Fans
    CX(s) Applied: B2.5
    Date: 01/28/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 28, 2013

    Stiffen Canyon Exhaust Fan 3 Motor Pedestal
    CX(s) Applied: B2.5
    Date: 01/28/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 11, 2013

    Michigan-City-Macomb, Township of
    CX(s) Applied: A1, A9, A11, B2.5, B5.1
    Date: 01/11/2013
    Location(s): Michigan
    Offices(s): Energy Efficiency and Renewable Energy

  • December 14, 2012

    Washington River Protection Solutions LLC - Facility Safety and Environmental Improvements
    CX(s) Applied: B2.5
    Date: 12/14/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 11, 2012

    Cathodic Protection Potential Stations at 292-S Diesel Fuel Oil Storage Tanks
    CX(s) Applied: B2.5
    Date: 12/11/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 7, 2012

    735-A, D-112, -113, and -114 Laboratory Renovations
    CX(s) Applied: B2.5
    Date: 12/07/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 7, 2012

    Installation of a High Flux Thermal Neutron Source
    CX(s) Applied: B2.5
    Date: 12/07/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 5, 2012

    Mission Support Alliance Annual Categorical Exclusion for Facility Safety and Environmental Improvements under10 CFR 1021, Subpart D
    CX(s) Applied: B2.5
    Date: 12/05/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 5, 2012

    Advanced Test Reactor (ATR) Transition to Commercial Power
    CX(s) Applied: B2.5
    Date: 12/05/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 29, 2012

    Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670
    CX(s) Applied: B2.5
    Date: 11/29/2012
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • November 19, 2012

    Personnel Safety Enhancements
    CX(s) Applied: B2.3, B2.5
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 19, 2012

    Replacement, Removal, and Closure of Underground Storage Tanks
    CX(s) Applied: B2.5, B6.1
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 15, 2012

    Nevada-City-North Las Vegas
    CX(s) Applied: A1, A9, B1.32, B2.5, B5.1
    Date: 11/15/2012
    Location(s): Nevada
    Offices(s): Energy Efficiency and Renewable Energy

  • November 6, 2012

    CH2MHill Plateau Remediation Company - Safety and Environmental Improvements of a Facility and Replacement/Upgrade of Facility Components
    CX(s) Applied: B2.5
    Date: 11/06/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • October 18, 2012

    Central Facilities Area (CFA)-696 Gasoline Tank Installation
    CX(s) Applied: B2.5
    Date: 10/18/2012
    Location(s): Idaho
    Offices(s): Nuclear Energy

  • September 21, 2012

    Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
    CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
    Date: 09/21/2012
    Location(s): Grand Junction
    Offices(s): Legacy Management

  • September 17, 2012

    Site-Wide CFC Reduction by Replacing 13 Existing Water Fountains and Eight Air Conditioning Units at National Energy Technology Laboratory
    CX(s) Applied: B2.5
    Date: 09/17/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory