You are here

Categorical Exclusion Determinations: B2.5

Existing Regulations

B2.5: Facility safety and environmental improvements
Safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/upgrade of control valves, in-core monitoring devices, facility air filtration systems, or substation transformers or capacitors; addition of structural bracing to meet earthquake standards and/or sustain high wind loading; and replacement of aboveground or belowground tanks and related piping, provided that there is no evidence of leakage, based on testing in accordance with applicable requirements (such as 40 CFR part 265, “Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities” and 40 CFR part 280, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks”). These actions do not include rebuilding or modifying substantial portions of a facility (such as replacing a reactor vessel).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • July 25, 2013

    B-19 Roof Replacement and Fall Arrest System Installation
    CX(s) Applied: B1.15, B2.5
    Date: 07/25/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • July 25, 2013

    B-40 Daycare Evacuation Sidewalks
    CX(s) Applied: B1.13, B2.5
    Date: 07/25/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • July 17, 2013

    Building 4 Ventilation Upgrades
    CX(s) Applied: B2.1, B2.5
    Date: 07/17/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • July 17, 2013

    Pittsburgh Site Wide Exterior Door Repair/Replacement Project
    CX(s) Applied: B2.1, B2.5
    Date: 07/17/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • July 1, 2013

    Removal of Heat Exchangers and Associated Piping from Disassembly Roof
    CX(s) Applied: B2.5
    Date: 07/01/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 28, 2013

    Optimization Project Area #2
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 06/28/2013
    Location(s): Wyoming
    Offices(s): RMOTC

  • June 26, 2013

    Pittsburgh Building 84 Gas Line Project
    CX(s) Applied: B2.5
    Date: 06/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 26, 2013

    Pittsburgh Building 84 Gas Line Project
    CX(s) Applied: B2.5
    Date: 06/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 25, 2013

    Materials and Fuels Complex Diversion Dam
    CX(s) Applied: B2.5
    Date: 06/25/2013
    Location(s): Idaho
    Offices(s): Idaho Operations Office

  • June 24, 2013

    Facility Safety and Environmental Improvements in the 300 Area - 2013
    CX(s) Applied: B2.5
    Date: 06/24/2013
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • June 17, 2013

    Building 64 and 92 Roof Replacement
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 06/17/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • May 29, 2013

    Office of Secure Transportation Vehicle Maintenance Facility Improvements
    CX(s) Applied: B2.1, B2.2, B2.5, B4.6
    Date: 05/29/2013
    Location(s): Tennessee
    Offices(s): Oak Ridge Office

  • May 29, 2013

    Installation Support of Supplemental Ventilation at Tank 15
    CX(s) Applied: B2.5
    Date: 05/29/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • May 22, 2013

    Line 3002 and 3002A Electrical Transmission Line Reconductoring Project
    CX(s) Applied: B2.5
    Date: 05/22/2013
    Location(s): Missouri, Missouri
    Offices(s): Southwestern Power Administration

  • May 17, 2013

    Substation Maintenance and Renovation Activities
    CX(s) Applied: B1.3, B1.7, B1.11, B1.27, B1.31, B1.33, B2.2, B2.3, B2.5, B4.6
    Date: 05/17/2013
    Location(s): Colorado, Wyoming, Nebraska, Montana, Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 7, 2013

    735-A, D-Wing, Main Floor - ARGUS Halon Suppression System Replacement
    CX(s) Applied: B2.5
    Date: 05/07/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • May 3, 2013

    Building For Re-Roofing Project
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 05/03/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • April 16, 2013

    B-4 Rooms 110, 111, and 112 Roof Top Heating, Ventilation, and Air Conditioning Unit Replacement
    CX(s) Applied: B1.4, B2.1, B2.2, B2.5
    Date: 04/16/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • April 16, 2013

    Site Arc Flash Electrical Upgrades
    CX(s) Applied: B1.3, B2.5
    Date: 04/16/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • April 10, 2013

    B903 Renovation
    CX(s) Applied: B1.16, B1.29, B2.1, B2.5
    Date: 04/10/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • April 1, 2013

    Alaska-TRIBE-ASSOCIATION OF VILLAGE COUNCIL PRESIDENTS, INC
    CX(s) Applied: B2.5, B5.1
    Date: 04/11/2013
    Location(s): Alaska
    Offices(s): Energy Efficiency and Renewable Energy

  • March 13, 2013

    Easts Ide Renovation Project Zone 1-Revision (T-1-11)
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 03/13/2014
    Location(s): Wyoming
    Offices(s): RMOTC

  • March 13, 2013

    Easts Ide Renovation Project Zone 1-Revision (T-1-11)
    CX(s) Applied: B2.5, B5.2, B5.4, B5.5
    Date: 03/13/2014
    Location(s): Wyoming
    Offices(s): RMOTC

  • March 11, 2013

    Correct Obstruction in the Sprinkler System on Level 3 of HB-Line
    CX(s) Applied: B2.5
    Date: 03/11/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • March 7, 2013

    Permanent Power for MCU Sampling Building Heating, Ventilation and Air Conditioning and Ancillary
    CX(s) Applied: B2.5
    Date: 03/07/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office