You are here

Categorical Exclusion Determinations: B2.3

Existing Regulations

B2.3: Personnel safety and health equipment
Installation of, or improvements to, equipment for personnel safety and health (including, but not limited to, eye washes, safety showers, radiation monitoring devices, fumehoods, and associated collection and exhaust systems), provided that the covered actions would not have the potential to cause a significant increase in emissions.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • January 26, 2014

    Routine Maintenance Activities
    CX(s) Applied: B1.3, B1.4, B1.5, B1.6, B1.7, B1.8, B1.11, B1.13, B1.15, B1.16, B1.17, B1.21, B1.22, B1.23, B1.27, B1.28, B1.31, B1.32, B2.1, B2.2, B2.3, B2.5
    Date: 01/26/2014
    Location(s): New Jersey
    Offices(s): Princeton Site Office

  • December 11, 2013

    Add Blanks in CHEX Ductwork Between FLT-34 and FLT-35
    CX(s) Applied: B2.3
    Date: 12/11/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • October 17, 2013

    Construction and Maintenance Activities at Existing Field Offices and Operation Centers
    CX(s) Applied: B1.3, B1.4, B1.11, B1.16, B1.17, B1.27, B1.31, B1.33, B1.34, B2.2, B2.3, B2.5, B4.7, B5.1, B5.16, B5.17, B5.23
    Date: 10/17/2013
    Location(s): CX: none
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • September 26, 2013

    Safety, Health, and Environmental Improvements for FY2014 and FY2015
    CX(s) Applied: B2.1, B2.2, B2.3, B2.5
    Date: 09/26/2013
    Location(s): Texas
    Offices(s): Pantex Site Office

  • August 1, 2013

    Disconnect Equipment and Activate Gloveboxes From Lab 174, Gloveboxes 12 & 13
    CX(s) Applied: B2.3
    Date: 08/01/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 25, 2013

    Building 58 Third Floor Mezzanine Enclosure
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 07/25/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • July 16, 2013

    Replace 735-A South Header Ductwork Located on D-wing Service Floor
    CX(s) Applied: B2.3
    Date: 07/16/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 28, 2013

    Pittsburgh Building 65 and Building 74 Loading Dock Railing Project
    CX(s) Applied: B2.1, B2.3
    Date: 06/28/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 28, 2013

    Pittsburgh Building 65 and Building 74 Loading Dock Railing Project
    CX(s) Applied: B2.1, B2.3
    Date: 06/28/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 26, 2013

    Pittsburgh B901 Mezzanine Project
    CX(s) Applied: B1.15, B1.23, B2.3
    Date: 06/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 26, 2013

    Pittsburgh B901 Mezzanine Project
    CX(s) Applied: B1.15, B1.23, B2.3
    Date: 06/26/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • May 17, 2013

    Substation Maintenance and Renovation Activities
    CX(s) Applied: B1.3, B1.7, B1.11, B1.27, B1.31, B1.33, B2.2, B2.3, B2.5, B4.6
    Date: 05/17/2013
    Location(s): Colorado, Wyoming, Nebraska, Montana, Utah
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 3, 2013

    Modification to the Petrography Laboratory
    CX(s) Applied: B2.3, B3.6
    Date: 05/03/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • April 30, 2013

    Add Blanks in Central Hood Exhaust (CHEX) Ductwork Between FLT-14 and FLT-15 and Between FLT-31 and FLT-32
    CX(s) Applied: B2.3
    Date: 04/30/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • December 19, 2012

    Installation of a Ballymore Ladder at Sampling Location 4MC-002F
    CX(s) Applied: B2.3
    Date: 12/19/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • November 19, 2012

    Maintenance Activities
    CX(s) Applied: B1.3, B1.27, B2.1, B2.2, B2.3, B5.1
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 19, 2012

    Personnel Safety Enhancements
    CX(s) Applied: B2.3, B2.5
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 19, 2012

    Ventilation Activities
    CX(s) Applied: B1.4, B1.16, B2.1, B2.3
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • September 21, 2012

    Pittsburgh B84 Roof Fall Protection
    CX(s) Applied: B2.1, B2.3
    Date: 09/21/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 13, 2012

    Security Camera Installation
    CX(s) Applied: A11, B1.7, B1.15, B2.2, B2.3
    Date: 09/13/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 7, 2012

    Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 09/07/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 31, 2012

    B-22A Renovation
    CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5
    Date: 08/31/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • August 29, 2012

    Pittsburgh B83 Boiler Room Ventilation/Cooling Project
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 08/29/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 1, 2012

    Parking Garage Gutter Replacement and Installation of Roof Ice Melt System
    CX(s) Applied: B2.3, B2.5
    Date: 08/01/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • June 8, 2012

    Renovations and Maintenance Activities for Buildings, Structures, Infrastructures and Equipment
    CX(s) Applied: B1.3, 61.4, 61.5, B1.11, B1.15, B1.16, B1.17, 81.22, B1.27, 62.1, B2.2, B2.3, 62.5
    Date: 06/08/2012
    Location(s): Illinois
    Offices(s): New Brunswick Laboratory