You are here

Categorical Exclusion Determinations: B2.1

Existing Regulations

B2.1: Workplace enhancements
Modifications within or contiguous to an existing structure, in a previously disturbed or developed area, to enhance workplace habitability (including, but not limited to, installation or improvements to lighting, radiation shielding, or heating/ventilating/air conditioning and its instrumentation, and noise reduction).

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • April 16, 2013

    B-4 Rooms 110, 111, and 112 Roof Top Heating, Ventilation, and Air Conditioning Unit Replacement
    CX(s) Applied: B1.4, B2.1, B2.2, B2.5
    Date: 04/16/2013
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • April 10, 2013

    B903 Renovation
    CX(s) Applied: B1.16, B1.29, B2.1, B2.5
    Date: 04/10/2013
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • March 7, 2013

    Installation of Power Rack in Blast Resistant Enclosures (BREs) 3 Through 8
    CX(s) Applied: B2.1
    Date: 03/07/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 17, 2013

    Power to H-1Y Laydown Yard
    CX(s) Applied: B2.1
    Date: 01/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 14, 2013

    Geothermal Retrofit of Illinois National Guard's State Headquarters Building
    CX(s) Applied: A9, B2.1, B5.19
    Date: 01/14/2013
    Location(s): Illinois
    Offices(s): Golden Field Office

  • December 18, 2012

    Washington River Protection Solutions LLC - Workplace Enhancements
    CX(s) Applied: B2.1
    Date: 12/18/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 12, 2012

    Loan Loss Reserve
    CX(s) Applied: A9, A11, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19
    Date: 12/12/2012
    Location(s): Hawaii
    Offices(s): Golden Field Office

  • November 19, 2012

    Maintenance Activities
    CX(s) Applied: B1.3, B1.27, B2.1, B2.2, B2.3, B5.1
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 19, 2012

    Ventilation Activities
    CX(s) Applied: B1.4, B1.16, B2.1, B2.3
    Date: 11/19/2012
    Location(s): Tennessee, California, California, Virginia
    Offices(s): Oak Ridge Office

  • November 9, 2012

    Y646 (Y189), Renovation of E-Wing Ventilation, Building 773-A
    CX(s) Applied: B2.1
    Date: 11/09/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 21, 2012

    Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
    CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
    Date: 09/21/2012
    Location(s): Grand Junction
    Offices(s): Legacy Management

  • September 21, 2012

    Pittsburgh B84 Roof Fall Protection
    CX(s) Applied: B2.1, B2.3
    Date: 09/21/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 7, 2012

    Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 09/07/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 5, 2012

    Project Z-064, Waste Sampling and Characterization Facility Heating, Ventilation, and Air Conditioning System Upgrade
    CX(s) Applied: B2.1
    Date: 09/05/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • August 31, 2012

    B-22A Renovation
    CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5
    Date: 08/31/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • August 30, 2012

    B17 Roof Replacement & Painting
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 08/30/2012
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • August 29, 2012

    Pittsburgh B83 Boiler Room Ventilation/Cooling Project
    CX(s) Applied: B2.1, B2.2, B2.3
    Date: 08/29/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • August 20, 2012

    Building 29-31 Internal Electrical Upgrades
    CX(s) Applied: B2.1, B2.5, B4.6
    Date: 08/20/2012
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • August 13, 2012

    Recovery Act State Energy Program Award for the State of Ohio - Revolving Loan Fund
    CX(s) Applied: A9, A11, B1.31, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19
    Date: 08/13/2012
    Location(s): Ohio
    Offices(s): Golden Field Office

  • July 19, 2012

    Recovery Act: Hybrid Ground Source Heat Pump System in Tennessee K-12 Schools
    CX(s) Applied: A9, B2.1, B5.19
    Date: 07/19/2012
    Location(s): Tennessee
    Offices(s): Golden Field Office

  • July 16, 2012

    Building 1 Renovation
    CX(s) Applied: B1.15, B1.16, B2.1, B2.2, B2.5
    Date: 07/16/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • July 10, 2012

    Utility Energy Service Contract Closed Loop Centrifugal Chiller at the Central Chilled Water Facility
    CX(s) Applied: B1.5, B2.1
    Date: 07/10/2012
    Location(s): New York
    Offices(s): Brookhaven Site Office

  • June 28, 2012

    Buildings 7-8 Roof Replacements & Buildings 14-16 Demolitions
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 06/28/2012
    Location(s): New York
    Offices(s): National Energy Technology Laboratory

  • June 19, 2012

    Middlesex Community College - Geothermal Project
    CX(s) Applied: A9, B2.1, B2.2, B5.19
    Date: 06/19/2012
    Location(s): Massachusetts
    Offices(s): Golden Field Office

  • May 15, 2012

    Recovery Act: Tennessee Energy Efficient Schools Initiative Ground Source Heat Pump Program
    CX(s) Applied: A9, B2.1, B5.19
    Date: 05/15/2012
    Location(s): Tennessee
    Offices(s): Golden Field Office