Western's Power Marketing Operations Center New Fiber Optic Cable Installation
CX(s) Applied: B1.31, B2.2, B4.7
Date: 01/16/2013
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region
Existing Regulations
B1.31: Installation or relocation of machinery and equipment
Installation or relocation and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic hardware, manufacturing machinery, maintenance equipment, and health and safety equipment), provided that uses of the installed or relocated items are consistent with the general missions of the receiving structure. Covered actions include modifications to an existing building, within or contiguous to a previously disturbed or developed area, that are necessary for equipment installation and relocation. Such modifications would not appreciably increase the footprint or height of the existing building or have the potential to cause significant changes to the type and magnitude of environmental impacts.
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
January 16, 2013
-
January 14, 2013
High Density Fuel Material for Light Water Reactors (LWRs)
CX(s) Applied: B1.31
Date: 01/14/2013
Location(s): Idaho
Offices(s): Nuclear Energy -
January 14, 2013
Advanced Battery Concepts
CX(s) Applied: B1.31, B5.1
Date: 01/14/2013
Location(s): Michigan
Offices(s): Golden Field Office -
January 8, 2013
Building 4 Drain Line Replacement
CX(s) Applied: B1.3, B1.15, B1.31
Date: 01/08/2013
Location(s): Oregon
Offices(s): National Energy Technology Laboratory -
December 19, 2012
Demonstrate Use of Various Distributed Energy Resources to Reduce Peak Load on Selected Feeders
CX(s) Applied: A1, B1.3, B1.7, B1.31, B2.2, B4.4, B4.13, B5.1, B4.8
Date: 12/19/2012
Location(s): Colorado
Offices(s): National Energy Technology Laboratory -
December 14, 2012
Washington River Protection Solutions LLC - Installation or Relocation of Machinery and Equipment
CX(s) Applied: B1.31
Date: 12/14/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office -
December 13, 2012
Sologen Geothermal Co-Production Field Demonstration
CX(s) Applied: A9, B1.31, B3.1, B4.12, B5.5, B5.12, B5.15
Date: 12/13/2012
Location(s): Texas
Offices(s): Golden Field Office -
December 5, 2012
Mission Support Alliance Annual Categorical Exclusion for Installation or Relocation of Machinery and Equipment under 10 CFR 1021, Subpart D, Appendix B
CX(s) Applied: B1.31
Date: 12/05/2012
Location(s): Washington
Offices(s): River Protection-Richland Operations Office -
November 21, 2012
In-Situ X-Ray Analysis of Rapid Thermal Processing for Thin-Fil Solar Cells
CX(s) Applied: A9, B1.31, B3.6
Date: 11/21/2012
Location(s): California, Colorado
Offices(s): Golden Field Office -
November 19, 2012
Alterations to Existing Buildings, Construction of Small-Scale Support Structures, and Relocation of Machinery and Equipment
CX(s) Applied: B1.11, B1.15, B1.31
Date: 11/19/2012
Location(s): Tennessee, California, California, Virginia
Offices(s): Oak Ridge Office -
October 24, 2012
Routine Operating and Administrative Activities (ROAA)
CX(s) Applied: A8, A9, A11, B1.3, B1.23, B1.31
Date: 10/24/2012
Location(s): Missouri
Offices(s): Kansas City Site Office -
September 18, 2012
New Orleans Emergency Generator Installation (900 Building)
CX(s) Applied: B1.31
Date: 09/18/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
September 13, 2012
Joyce Street Warehouse Facility; NREL
CX(s) Applied: B1.31, B1.35
Date: 09/13/2012
Location(s): Colorado
Offices(s): Golden Field Office -
August 22, 2012
A Novel Flash lronmaking Process
CX(s) Applied: A9, B1.31, B3.6
Date: 08/22/2012
Location(s): Utah
Offices(s): Golden Field Office -
August 22, 2012
Clemson University 15 Megawatt Hardware-In-the-Loop (HIL) Grid Simulator
CX(s) Applied: A9, B1.31
Date: 08/22/2012
Location(s): South Carolina
Offices(s): Golden Field Office -
August 13, 2012
Recovery Act State Energy Program Award for the State of Ohio - Revolving Loan Fund
CX(s) Applied: A9, A11, B1.31, B1.32, B1.35, B2.1, B2.2, B5.1, B5.14, B5.16, B5.17, B5.18, B5.19
Date: 08/13/2012
Location(s): Ohio
Offices(s): Golden Field Office -
July 26, 2012
Install Power Metering for Strategic Petroleum Reserve Site Buildings
CX(s) Applied: B1.31
Date: 07/26/2012
Location(s): Louisiana, Texas, Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office -
July 20, 2012
Modify the HB-Line Can Inerting System
CX(s) Applied: B1.31
Date: 07/20/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
July 18, 2012
Project 1769 - Relocate NC-135 Site Operations
CX(s) Applied: B1.24, B1.31
Date: 07/18/2012
Location(s): Missouri
Offices(s): Kansas City Site Office -
June 21, 2012
SANfab: Module Manufacturing Facility
CX(s) Applied: A9, B1.31, B5.1
Date: 06/21/2012
Location(s): California
Offices(s): Golden Field Office -
June 21, 2012
1366 Project Silicon: Reclaiming US Silicon Photovoltaic Leadership
CX(s) Applied: A9, B1.31, B3.6, B5.1
Date: 06/21/2012
Location(s): Massachusetts
Offices(s): Golden Field Office -
June 19, 2012
Building 93 Heat Exchanger Removal at National Energy Technology Laboratory Pittsburgh
CX(s) Applied: B1.23, B1.31
Date: 06/19/2012
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory -
June 4, 2012
Dry Air Glove Box Projects
CX(s) Applied: B1.31
Date: 06/04/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office -
May 21, 2012
Idaho National Laboratory (INL) Administration Building (IAB) Communication Room Heating, Ventilation, and Air Conditioning (HVAC) Upgrade
CX(s) Applied: B1.31
Date: 05/21/2012
Location(s): Idaho
Offices(s): Idaho Operations Office -
May 14, 2012
Milling Machine Replacement Projects
CX(s) Applied: B1.31
Date: 05/14/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office