Ethylene Glycol/Water with Selenium (~15 Gallons) will be drained to the Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment Faci…
Ethylene Glycol with Selenium (~20 Gallons) will be drained to the Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment Facility.…
LM is proposing to conduct routine long-term surveillance and maintenance (LTS and M) actions at the Boiling Nuclear Superheater (BONUS), Puerto Ri…
The proposed work activity is to transfer wastewater from the F-Canyon B-Basins to the Effluent Treatment Facility (ETF) using an approved Waste Co…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Fermi National Accelerator Laboratory (Fermilab) proposes to continue the periodic shipment of low-level radioactive waste, excluding high level wa…
Drain and Disposition 717-A Drill Press.…
Various tanks/pits at 607-4B fill up with rainwater and collect biologics and wildlife. Fill tanks/pits with approved material to prevent rainwater…
238-H is in the process of being decommissioned. Auxiliary plant lines need to be cut and capped to be decommissioned.…
This categorical exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…