You are here

Categorical Exclusion Determinations: B1.23

Existing Regulations

B1.23: Demolition and disposal of buildings
Demolition and subsequent disposal of buildings, equipment, and support structures (including, but not limited to, smoke stacks and parking lot surfaces), provided that there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • October 17, 2012

    Removal of Out-of-Service Steam Line Segment; D-Area to Ameresco Biomass Cogeneration Facility
    CX(s) Applied: B1.23
    Date: 10/17/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 24, 2012

    B28 Demolition National Energy Technology Laboratory Morgantown
    CX(s) Applied: B1.23
    Date: 09/24/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • September 24, 2012

    Remove Odor Control System Located at the Southeast Exterior Corner of National Energy Technology Laboratory Morgantown Building 17
    CX(s) Applied: B1.23
    Date: 09/24/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • September 21, 2012

    Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
    CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
    Date: 09/21/2012
    Location(s): Grand Junction
    Offices(s): Legacy Management

  • September 17, 2012

    Audio/Video Technology Refresh: PGH/MGN
    CX(s) Applied: B1.15, B1.23, B2.2
    Date: 09/17/2012
    Location(s): West Virginia, Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 17, 2012

    Kansas-City-Olathe
    CX(s) Applied: A9, A11, B1.23, B5.1, B5.23
    Date: 09/17/2012
    Location(s): Kansas
    Offices(s): Energy Efficiency and Renewable Energy

  • September 12, 2012

    Design for High Performance Sustainable Building Modifications Based on E4 Report - PGH
    CX(s) Applied: B1.15, B1.23, B2.2
    Date: 09/12/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 12, 2012

    Design for High Performance Sustainable Building Modifications Based on E4 Report - MGN
    CX(s) Applied: B1.15, B1.23, B2.2
    Date: 09/12/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • August 31, 2012

    B-22A Renovation
    CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5
    Date: 08/31/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • August 30, 2012

    B17 Roof Replacement & Painting
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 08/30/2012
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • August 28, 2012

    Deactivation and Demolition of Oak Ridge National Laboratory Buildings 3546 and 3606 (CX-3703X)
    CX(s) Applied: B1.23
    Date: 08/28/2012
    Location(s): Tennessee
    Offices(s): Oak Ridge Office

  • August 25, 2012

    Remove/Demolish T-20, T-14, T-15, T-29
    CX(s) Applied: B1.23
    Date: 08/25/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • August 24, 2012

    Building 28-33 External Electrical Upgrades
    CX(s) Applied: B1.23, B2.5, B4.6, B4.13
    Date: 08/24/2012
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • August 8, 2012

    Pittsburgh Guard Shack Replacement
    CX(s) Applied: B1.23, B1.24
    Date: 08/08/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • July 26, 2012

    Removal of Out-of-Service Railroad Segment
    CX(s) Applied: B1.23
    Date: 07/26/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 26, 2012

    Removal of Out-of-Service Steam Line Segment
    CX(s) Applied: B1.23
    Date: 07/26/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 24, 2012

    Deactivation and Decommissioning of the D-Area Detritiation Cells and Relocation of Associated Handi-Houses
    CX(s) Applied: B1.23
    Date: 07/24/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 24, 2012

    Dismantle and Remove Low Level Waste Loading Station, Building 735-A
    CX(s) Applied: B1.23
    Date: 07/24/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 20, 2012

    Sample and Remove HEPA Filters from 690-N (Ford) Building
    CX(s) Applied: B1.23
    Date: 07/20/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 16, 2012

    F-Area Infrasturcture Improvement
    CX(s) Applied: B1.23
    Date: 07/16/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • July 5, 2012

    Disposition of F-Area Water Buffalo and Tuff Tank
    CX(s) Applied: B1.23
    Date: 07/05/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 28, 2012

    Buildings 7-8 Roof Replacements & Buildings 14-16 Demolitions
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 06/28/2012
    Location(s): New York
    Offices(s): National Energy Technology Laboratory

  • June 19, 2012

    Building 93 Heat Exchanger Removal at National Energy Technology Laboratory Pittsburgh
    CX(s) Applied: B1.23, B1.31
    Date: 06/19/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • June 18, 2012

    Remove Roof Over the North-east Spill Basin 235-F
    CX(s) Applied: B1.23
    Date: 06/18/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • June 18, 2012

    Decommissioning and Demolition (D&D) of 681-11N
    CX(s) Applied: B1.23
    Date: 06/18/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office