You are here

Categorical Exclusion Determinations: B1.23

Existing Regulations

B1.23: Demolition and disposal of buildings
Demolition and subsequent disposal of buildings, equipment, and support structures (including, but not limited to, smoke stacks and parking lot surfaces), provided that there would be no potential for release of substances at a level, or in a form, that could pose a threat to public health or the environment.

Previous Regulations

Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.

DOCUMENTS AVAILABLE FOR DOWNLOAD

  • May 20, 2013

    Eastern Colorado Field Office Com Buildings Removal
    CX(s) Applied: B1.22, B1.23, B1.24
    Date: 05/20/2013
    Location(s): Colorado, Wyoming, Wyoming
    Offices(s): Western Area Power Administration-Rocky Mountain Region

  • May 3, 2013

    Building For Re-Roofing Project
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 05/03/2013
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • March 27, 2013

    Abandon-In-Place Four Cell Extensions Located at Seven Spings Laydown Yard
    CX(s) Applied: B1.23
    Date: 03/27/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • February 28, 2013

    Utility Disconnect from Modular Trailers
    CX(s) Applied: B1.27, B1.23
    Date: 02/28/2012
    Location(s): New Mexico
    Offices(s): NNSA-I

  • January 22, 2013

    Removal of Glass Feed Prep System from 786-A (EDL)
    CX(s) Applied: B1.23
    Date: 01/22/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 17, 2013

    Deactivation and Decommissioning of Soil Vapor Extraction Units
    CX(s) Applied: B1.23
    Date: 01/17/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 15, 2013

    Deactivation and Decommissioning of Soil Vapor Extraction Units
    CX(s) Applied: B1.23
    Date: 01/15/2013
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • January 9, 2013

    C-CA-CAM Building Complex Demolition and Site Restoration
    CX(s) Applied: B1.11, B1.16, B1.17, B1.23, B1.24, B1.27, B1.30, B1.33, B1.34
    Date: 01/09/2013
    Location(s): Pennsylvania
    Offices(s): Naval Nuclear Propulsion Program

  • December 14, 2012

    Washington River Protection Solutions LLC - Demolition and Disposal of Buildings
    CX(s) Applied: B1.23
    Date: 12/14/2012
    Location(s): Washington
    Offices(s): River Protection-Richland Operations Office

  • December 5, 2012

    Demolition of Trailers 272, 280, 835, and 852
    CX(s) Applied: B1.23
    Date: 12/05/2012
    Location(s): New York
    Offices(s): Brookhaven Site Office

  • October 24, 2012

    Routine Operating and Administrative Activities (ROAA)
    CX(s) Applied: A8, A9, A11, B1.3, B1.23, B1.31
    Date: 10/24/2012
    Location(s): Missouri
    Offices(s): Kansas City Site Office

  • October 17, 2012

    Removal of Out-of-Service Steam Line Segment; D-Area to Ameresco Biomass Cogeneration Facility
    CX(s) Applied: B1.23
    Date: 10/17/2012
    Location(s): South Carolina
    Offices(s): Savannah River Operations Office

  • September 24, 2012

    B28 Demolition National Energy Technology Laboratory Morgantown
    CX(s) Applied: B1.23
    Date: 09/24/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • September 24, 2012

    Remove Odor Control System Located at the Southeast Exterior Corner of National Energy Technology Laboratory Morgantown Building 17
    CX(s) Applied: B1.23
    Date: 09/24/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • September 21, 2012

    Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
    CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
    Date: 09/21/2012
    Location(s): Grand Junction
    Offices(s): Legacy Management

  • September 17, 2012

    Audio/Video Technology Refresh: PGH/MGN
    CX(s) Applied: B1.15, B1.23, B2.2
    Date: 09/17/2012
    Location(s): West Virginia, Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 17, 2012

    Kansas-City-Olathe
    CX(s) Applied: A9, A11, B1.23, B5.1, B5.23
    Date: 09/17/2012
    Location(s): Kansas
    Offices(s): Energy Efficiency and Renewable Energy

  • September 12, 2012

    Design for High Performance Sustainable Building Modifications Based on E4 Report - PGH
    CX(s) Applied: B1.15, B1.23, B2.2
    Date: 09/12/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory

  • September 12, 2012

    Design for High Performance Sustainable Building Modifications Based on E4 Report - MGN
    CX(s) Applied: B1.15, B1.23, B2.2
    Date: 09/12/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • August 31, 2012

    B-22A Renovation
    CX(s) Applied: B1.4, B1.7, B1.15, B1.23, B2.1, B2.3, B2.5
    Date: 08/31/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • August 30, 2012

    B17 Roof Replacement & Painting
    CX(s) Applied: B1.23, B2.1, B2.5
    Date: 08/30/2012
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • August 28, 2012

    Deactivation and Demolition of Oak Ridge National Laboratory Buildings 3546 and 3606 (CX-3703X)
    CX(s) Applied: B1.23
    Date: 08/28/2012
    Location(s): Tennessee
    Offices(s): Oak Ridge Office

  • August 25, 2012

    Remove/Demolish T-20, T-14, T-15, T-29
    CX(s) Applied: B1.23
    Date: 08/25/2012
    Location(s): West Virginia
    Offices(s): National Energy Technology Laboratory

  • August 24, 2012

    Building 28-33 External Electrical Upgrades
    CX(s) Applied: B1.23, B2.5, B4.6, B4.13
    Date: 08/24/2012
    Location(s): Oregon
    Offices(s): National Energy Technology Laboratory

  • August 8, 2012

    Pittsburgh Guard Shack Replacement
    CX(s) Applied: B1.23, B1.24
    Date: 08/08/2012
    Location(s): Pennsylvania
    Offices(s): National Energy Technology Laboratory