Nalco / Total Flow Loop Polymer Test
CX(s) Applied: B1.6, B1.13, B1.18
Date: 02/07/2013
Location(s): Wyoming
Offices(s): RMOTC
Existing Regulations
B1.13: Pathways, short access roads, and rail lines
Construction, acquisition, and relocation, consistent with applicable right-of-way conditions and approved land use or transportation improvement plans, of pedestrian walkways and trails, bicycle paths, small outdoor fitness areas, and short access roads and rail lines (such as branch and spur lines).
Previous Regulations
Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion.
DOCUMENTS AVAILABLE FOR DOWNLOAD
-
February 7, 2013
-
December 19, 2012
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line
CX(s) Applied: B1.3, B1.13
Date: 12/19/2012
Location(s): Washington, Idaho
Offices(s): Bonneville Power Administration -
September 21, 2012
Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site
CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1
Date: 09/21/2012
Location(s): Grand Junction
Offices(s): Legacy Management -
August 24, 2012
2012 Access Road Maintenance Along the Path 500 Kilovolt Transmission Line
CX(s) Applied: B1.3, B1.13
Date: 08/24/2012
Location(s): California, California
Offices(s): Western Area Power Administration -
June 26, 2012
Modeling Carbon Dioxide Sequestration in Saline Aquifer and Depleted Oil Reservoir (Task 17 - Borehole)
CX(s) Applied: A9, B1.13, B3.1, B3.7
Date: 06/26/2012
Location(s): Kansas
Offices(s): National Energy Technology Laboratory -
June 18, 2012
Platform Construction for Power Pole Work
CX(s) Applied: B1.13, B2.5, B4.6
Date: 06/18/2012
Location(s): Wyoming
Offices(s): RMOTC -
June 18, 2012
Platform Construction for Power Pole Work
CX(s) Applied: B1.13, B2.5, B4.6
Date: 06/18/2012
Location(s): Wyoming
Offices(s): RMOTC -
April 11, 2012
Energy Efficiency and Conservation Block Grant Program - Greenville County, South Carolina
CX(s) Applied: B1.13
Date: 04/11/2012
Location(s): South Carolina
Offices(s): Golden Field Office -
March 27, 2012
Minnesota City-Blaine
CX(s) Applied: A1, B1.13, B2.5, B5.1
Date: 03/27/2012
Location(s): Minnesota
Offices(s): Energy Efficiency and Renewable Energy -
December 13, 2011
Sidewalks to School
CX(s) Applied: B1.13
Date: 12/13/2011
Location(s): South Carolina
Offices(s): Golden Field Office -
November 28, 2011
Minor Road and Utility Operations
CX(s) Applied: B1.3, B1.7, B1.13, B1.32, B4.7
Date: 11/28/2011
Location(s): Washington
Offices(s): Science, Pacific Northwest Site Office -
November 21, 2011
Construction of a Connector Road Between the Construction Administration Complex (CAC) and the Mixed Oxide Administration Complex (MAC) Parking Lots
CX(s) Applied: B1.13
Date: 11/21/2011
Location(s): South Carolina
Offices(s): Savannah River Operations Office -
November 16, 2011
CATEGORICAL EXCLUSION (CX) FOR DEVELOPMENT AND IMPLEMENTATION OF TRANSPORTATION PROGRAMS TO CONSERVE ENERGY AND REDUCE ENVIRONMENTAL IMPACTS (CX-EECBG-006)
CX(s) Applied: A1, B1.13, B1.32, B5.1, B5.16
Date: 11/16/2011
Location(s): Nationwide
Office(s): Energy Efficiency & Renewable Energy (EERE) / Oak Ridge Office (ORO) -
November 16, 2011
Development and Implementation of Transportation Programs to Conserve Energy and Reduce Environmental Impacts
CX(s) Applied: A1, B1.13, B1.32, B5.1, B5.16
Date: 11/16/2011
Location(s): Nationwide
Offices(s): Energy Efficiency and Renewable Energy -
September 12, 2011
Naselle-Tarlett Nature Conservancy Access Road Funding
CX(s) Applied: B1.13
Date: 09/12/2011
Location(s): Pacific County, Washington
Office(s): Bonneville Power Administration -
August 22, 2011
Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line
CX(s) Applied: B1.3, B1.13
Date: 08/22/2011
Location(s): Douglas County, Washington
Office(s): Bonneville Power Administration -
August 22, 2011
Wood Pole Replacement Along the Grand Coulee-Okanogan #2 115-Kilovolt Transmission Line
CX(s) Applied: B1.3, B1.13
Date: 08/22/2011
Location(s): Grant County, Washington
Office(s): Bonneville Power Administration -
June 13, 2011
705-C Gravel Road Extension
CX(s) Applied: B1.13
Date: 06/13/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office -
June 8, 2011
Kennel Lights and Sidewalk
Date: 06/08/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office -
May 5, 2011
Stegall-Wayside 230 Kilovolt Access Road Extension
CX(s) Applied: B1.13
Date: 05/05/2011
Location(s): Dawes County, Wyoming
Office(s): Western Area Power Administration-Rocky Mountain Region -
April 19, 2011
Construction and Operation of a Cask Processing Enclosure (CPE) at the Transuranic (TRU) Waste Processing Center (TWPC) on the Oak Ridge Reservation, Lenoir City, Tennessee
CX(s) Applied: B1.13, B3.1, B6.6
Date: 04/19/2011
Location(s): Lenoir City, Tennessee
Office(s): Oak Ridge Office -
April 19, 2011
Construction and Operation of a Cask Processing Enclosure at the Transuranic Waste Processing Center on the Oak Ridge Reservation, Lenoir City, Tennessee
CX(s) Applied: B1.13, B3.1, B6.6
Date: 04/19/2011
Location(s): Lenoir City, Tennessee
Office(s): Environmental Management, Oak Ridge Office -
March 23, 2011
Sidewalks Repair at 704-23K and 701-12K
CX(s) Applied: B1.13
Date: 03/23/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office -
January 31, 2011
Overpack Transfer Path Extension General Plant Project
CX(s) Applied: B1.13
Date: 01/31/2011
Location(s): Idaho
Offices(s): Naval Nuclear Propulsion Program -
January 26, 2011
K-Area Entrance Roadway Expansion
CX(s) Applied: B1.13
Date: 01/26/2011
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office