You are here

Preliminary Design RM

The PD Review Module (RM) is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the PD prior to CD-2 approval. This PD RM can be applied anytime during the design prior to CD-2 approval. However, in practice, the design is typically review at the 30% design stage, which is corresponding to the end of the PD before initiation of final design.