February 2009

Evaluation to determine whether Waste Isolation Pilot Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

The Team conducted its review during February 23-March 6, 2009 to determine whether Washington TRU Solutions, LLCĀ is continuing to perform at a level deserving DOE-VPP Star recognition.