You are here

Case Study: Mobile Photovoltaic System at Bechler Meadows Ranger Station, Yellowstone National Park

Case study describes the performance of a mobile photovoltaic system installed in 2011 to provide power to Bechler Ranger Station in Yellowstone National Park, Wyoming. This small, remote outpost is not served by the electric utility grid and previously relied on a propane generator as the only source of power.